Perform A Cold Start; Figure 3-2 Power Switch Location; Figure 3-3 Load Button (S1) Location - NEC SL1100 Hardware Manual

Hide thumbs Also See for SL1100:
Table of Contents

Advertisement

SL1100

1.2.1 Perform a Cold Start

This section describes the process for starting the system for the first time or starting a system that
requires the customer data be deleted.
System software is loaded from flash memory, and the customer data is deleted
from RAM memory.
If Expansion KSU(s) are installed, turn the power on/off in the order of
Expansion 2 KSU, Expansion 1 KSU and then Main KSU.
To perform a Cold Start;
1.
Set the power switch to off position.
2.
Open the Sub-Cover on the Main KSU and identify the LOAD button (S1) location on the CPU
card.
3.
Once the system has powered off, push in and hold the LOAD button (S1).
If Expansion KSU(s) are installed, the Power Switch must be ON at
Expansion KSU(s).
3-2

Figure 3-2 Power Switch Location

Sub-Cover
Tab

Figure 3-3 Load Button (S1) Location

Tab
CPU card
< Front view >
ISSUE 6.0
S1
System Start Up

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl1100

Table of Contents