2 Unit installation
RPK - FSN(H)3M Wall mounted
Lift the unit carefully.
Hang the indoor unit on the mounting bracket, keeping it vertical. Secure the bottom cover and the mounting bracket with
three screws.
!
C A U T I O N
Make sure the unit is hanging correctly on the mounting bracket. Otherwise, the bracket could fall.
Removal of the front panel for RPK-(0.6-1.5)FSN(H)3M
Hold both sides of flat panel and open it fully.
Lift up the air filter, detach the catches from the indoor unit
and remove the air filter downward.
After the right arm shaft is expanded outward and the
shafts are removed from the front panel, pull the flat panel
frontward while the right arm shaft is slightly expanded
outward.
Attaching flat panel for RPK-(0.6-1.5)FSN(H)3M
Insert completely the left and right arm shafts of flat panel
into the holes along the guide at the front panel. After the
flat panel is attached completely, insert the catches for air
filter to fix.
60
SMGB0099 rev.0 - 12/2016
Hook
Mounting
bracket
Extrusion
Hook
Expand the shaft
toward arrow
direction.
Flat panel
Flat panel
Remove this part
from the hole.
Hole
Guide at
front panel
Front panel