Al600 Installation W/Folding 3Rd Row; Measure The Height Of The Well. [Figure - Harmar Mobility AL600 Installation And Owner's Manual

Side-door hybrid lift
Table of Contents

Advertisement

Installation - AL600
With Folding 3rd Row Seating
NOTE: A BA-02 Kit is needed for this installation.
More detailed instructions on BA-02 installation
will be provided with the BA-02 Kit.
1. Fold 3rd Row seating up, exposing the storage
well. [Figure 18-1]

2. Measure the height of the well. [Figure 18-2]

3. Position brackets as shown. Slide up
or down until you achieve the measured
well height. (Holes are arranged for ¼"
increments) [Figure 18-3]
18
SECTION 2 : INSTALLER
Figure 18-1
X
Figure 18-2
X
Figure 18-3
4. Attach brackets together and fasten using
supplied hardware. [Figure 18-4]
BHCS
1/4-20 x 3/4"
Nylock Nut
5. Position assembled parts around third row
seat(s) then fold into well. [Figure 18-5]
6. Install set screws (leave loose) as shown. Slide
foot plate assembly onto legs. [Figure 18-6]
7. Attach rails to brackets. [Figure 18-7]
1/4" Split Lock Washers
1/4-20 Acorn Nuts
Figure 18-7
© 2014 Harmar Mobility, LLC • All Rights Reserved
Figure 18-4
1/4-20
Figure 18-5
Figure 18-6

Advertisement

Table of Contents
loading

Table of Contents