Chapter 2 Preparations
1.21

Installing Air Duct

Install the air duct in reverse order of removal. See Chapter 2 (1.8 Removing Air Duct).
1.22

Installing Support Bar

Install support bar in reverse order of removal. See Chapter 2 (1.7 Removing Support Bar).
1.23

Installing Top Cover

When all internal optional devices are installed, close the server with Top Cover.
1. Put the Top Cover straight on the server chassis so that it can be surely engaged with the chassis frame.
2. Slide the Top Cover toward the front of the server.
3. Tighten Cap Screw on rear of the server.
Important
Before removing the air duct, put cables aside. Otherwise, cables may be damaged if
they are pulled together with air duct.
Express5800/R120g-2E User's Guide
1. Installing Internal Optional Devices
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

R120g-2eExp330aNec express5800 series

Table of Contents