NEC Exress5800 Series User Manual page 145

Table of Contents

Advertisement

Chapter 2 Preparations
(2)
Installation procedure
Mount the server to a rack in the following procedure.
1. Pull the slide rail from the outer rail until the
slide rail is locked.
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, see Safety Precautions and Regulatory Notices.
• Do not attempt to lift the server with single person.
• Do not drop.
• Do not leave the server being pulled out.
• Do not install with the cover removed.
• Do not get your fingers caught.
Important
Always install the server with two or more persons.
Note
Make sure that locking mechanism work normally.
Express5800/R120g-2E User's Guide
2. Installation and Connection
CAUTION
Locked state
Locking mechanism
145

Advertisement

Table of Contents
loading

This manual is also suitable for:

R120g-2eExp330aNec express5800 series

Table of Contents