Installation; Overview; Delivery Inspection; Special Requirements - Beckman Coulter FP 1000 Manual

Cell preparation system
Table of Contents

Advertisement

2.1

OVERVIEW

The information in this section includes:

DELIVERY INSPECTION

r

SPECIAL REQUIREMENTS

r
FP 1000 SOFTWARE INSTALLATION
r
REAGENT AND WASTE CONNECTIONS
r

SYSTEM CONNECTIONS

r
TRAINING CHECKLIST
r
2.2
DELIVERY INSPECTION
The instrument is tested before shipping. International symbols and special handling
instructions are printed on the shipping cartons to inform the carrier of the precautions and
care applicable to electronic instruments.
CAUTION
Risk of instrument damage. Possible instrument damage could occur if you uncrate the
instrument, install it, or set it up. Keep the instrument in its packaging until your Beckman Coulter
Representative uncrates it for installation and setup.
When you receive your instrument, carefully inspect all cartons. If you see signs of
mishandling or damage, file a claim with the carrier immediately. If separately insured, file the
claim with the insurance company.
2.3
SPECIAL REQUIREMENTS
Before your Beckman Coulter Representative arrives to install the instrument, you must
determine where you want the system placed and the overall layout. Consider the factors
described in the following paragraphs:

Space and Accessibility

In addition to the space required for the FP 1000, also arrange for:
Comfortable working height
r
Space for computer(s) and monitor(s)
r
Space for IsoFlow and waste containers
r
Adequate space in front to open the instrument doors
r
Space for ventilation, and access for maintenance and service
r
PN 623112BA
2

INSTALLATION

2-1
2

Advertisement

Table of Contents
loading

Table of Contents