10.1 SETTING EXAMPLE
The time delay should be longer than the longest normal clearing time for faults outside the generator zone. If the phase
VTs are wye-connected then this element should also be coordinated with VT secondary fuses to prevent false operations
for VT secondary ground faults. For the sample system a time delay of 1 second will be used. Make the following changes
in EnerVista UR Setup or through the
menu:
AUXILIARY OV1
b) 100% STATOR GROUND
The auxiliary voltage input is required for both the 100% stator ground and the third harmonic neutral undervoltage ele-
ments. Therefore the NEUTRL source will be assigned for these elements. Make the following changes in the
GROUPED ELEMENTS
STATOR GROUND SOURCE:
This 100% stator ground element provides ground fault protection for the neutral end of the stator winding. The element
has two stages. In this application, stage 1 is used to trip the machine and stage 2 is used for alarm purposes. Set the
pickup to 0.15 for both stages to provide adequate overlap with the auxiliary overvoltage element. Set stage 1 to 0.375 V
secondary (this value may be increased for security in particularly noisy environments). Stage 2 is typically set at 0.3 V sec-
ondary. The supervision settings are expressed in per unit of the
settings are 5 seconds and 1 second for the Stage 1 and Stage 2 elements respectively.
STG1 SUPV
Make the following changes in EnerVista UR Setup or through the
1
STATOR GROUND
10
10-8
SETTINGS
SETTING GROUP 1
STATOR GROUND
"SRC 2" (the "NEUTRL" source)
0.375 V
-------------------- -
0.0057 pu
=
=
66 V
menu:
100% STATOR GROUND
G60 Generator Protection System
GROUPED ELEMENTS
SETTING GROUP 1
menu
NOMINAL PHASE VT SECONDARY
0.300 V
STG2 SUPV
-------------------- -
,
=
66 V
SETTINGS
GROUPED ELEMENTS
10 APPLICATION OF SETTINGS
VOLTAGE ELEMENTS
setting. The time delay
0.0045 pu
=
SETTING GROUP
GE Multilin
SETTINGS
(EQ 10.30)