5.4 SYSTEM SETUP
a 50 Hz system) and each aggregator can be configured to support a TCP or a UDP connection to a client allowing the UR
to support a total of two TCP connections or two UDP connections or a combination of a TCP and a UDP connection per
aggregator for real-time data reporting. Also note that if hard fiber is used it will have no impact on this specification.
Precise IRIG-B input is vital for correct synchrophasor measurement and reporting. A DC level shift IRIG-B receiver
must be used for the phasor measurement unit to output proper synchrophasor values.
NOTE
The PMU settings are organized in five logical groups as follows.

PATH: SETTINGS
SYSTEM SETUP
 PHASOR MEASUREMENT
 UNIT 1
5
5-90

PHASOR MEASUREMENT UNIT
 PMU 1 BASIC
 CONFIGURATION
 PMU 1
MESSAGE
 AGGREGATORS
 PMU 1
MESSAGE
 CALIBRATION
 PMU 1
MESSAGE
 TRIGGERING
 PMU 1
MESSAGE
 RECORDING
G60 Generator Protection System

PHASOR MEASUREMENT UNIT 1
See page 5-91.
See page 5-95.
See page 5-97.
See page 5-98.
See page 5-105.