Charging System - TGB 525 Service Manual

Table of Contents

Advertisement

Charging System

Charging circuit
Main switch
Fuse 20A
Battery
Current Leakage Inspection
Turn the main switch to OFF position, and remove
the negative cable terminal (-) from the battery.
Connect an ammeter between the negative cable
terminal and the battery negative terminal.
Caution
● In the current leakage test, set the current
range at the largest scale, then gradually
decrease to the lower scale as the test
process goes to avoid possible damage to
the ammeter and the fuse.
● Do not turn the main switch to ON position
during test.
If the leaked current exceeds the specified value, it
may indicate a short circuit.
Allowable current leakage: Less than 1mA
Disconnect each cable one by one and take
measurement of the current of each cable to
locate the short circuit.
PDF created with pdfFactory Pro trial version
To this chapter contents
Black
Blue
B/R
Regulator rectifier
www.pdffactory.com
17. ELECTRICAL SYSTEM
Yellow
Yellow
AC. Generator
Battery negative terminal
Yellow
17-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents