TGB 525 Service Manual page 11

Table of Contents

Advertisement

1. GENERAL INFORMATION
● When separating a connector, it locker has to be
unlocked firstly. Then, conduct the service
operation.
● Do not pull the wires as removing a connector
or wires.
Hold the connector body.
● Make sure if the connector pins are bent,
extruded or loosen.
● Insert the connector completely.
If there are two lockers on two connector sides,
make sure the lockers are locked in properly.
Check if any wire loose.
● Check if the connector is covered by the twin
connector boot completely and secured
properly.
● Before terminal connection, check if the boot is
crack or the terminal is loose.
1-6
PDF created with pdfFactory Pro trial version
To this chapter contents
● Insert the terminal completely.
Check if the terminal is covered by the boot.
Do not let boot open facing up.
● Secure wires and wire harnesses to the frame
with respective wire bands at the designated
locations. Tighten the bands so that only the
insulated surfaces contact the wires or wire
harnesses.
● Wire band and wire harness have to be
clamped secured properly.
● Do not squeeze wires against the weld or its
clamp.
www.pdffactory.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents