Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Eaton Manuals
UPS
Power Xpert 9395P
User and installation manual
Table 3-3: Air Conditioning Or Ventilation Requirements During Full Load Operation; Figure 3-1. Ups Cabinet Dimensions (Front View) - Eaton Power Xpert 9395P User And Installation Manual
500 kva / 600 kva
Hide thumbs
Also See for Power Xpert 9395P
:
Installation manual
(32 pages)
,
Mechanical installation manual
(31 pages)
,
Installation and operation manual
(239 pages)
1
2
3
4
Table Of Contents
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
page
of
147
Go
/
147
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
Rating/kVA
500 kVA
600 kVA
Table 3-3: Air conditioning or ventilation requirements during full load operation
Ventilation required for cooling air exhaust: approximately 920 liter/sec/250-300kVA unit, + 280 liter/sec
(ISBM).
Figure 3-1. UPS cabinet dimensions (front view)
P-164000476
Revision 002
Heat rejection
kW
19.8
25.5
1882
1874
9395P 500kVA / 600 kVA
User's and Installation Guide
Heat rejection
BTU / h x 1000
67.6
87.0
13
Table of
Contents
Previous
Page
Next
Page
1
...
20
21
22
23
24
25
26
27
Advertisement
Table of Contents
Related Manuals for Eaton Power Xpert 9395P
UPS Eaton Power Xpert 9395 Installation And Operation Manual
Ups 1000-1100 kva, for use with three upm 650-825 kva and four upm 1000-1100 kva ups (239 pages)
UPS Eaton Power Xpert 9395P-1100/1100 Installation And Operation Manual
(214 pages)
UPS Eaton Power Xpert 9395 Installation And Operation Manual
(205 pages)
UPS Eaton CA22106060000R6 Installation And Operation Manual
High performance 300 kva, 300 kw for use with single upm (200–300 kva) and plus 1 (200–300 kva) ups models (172 pages)
UPS Eaton 9 55 Series Manual
(62 pages)
Controller Eaton 9315P Installation And Operation Manual
Fixed primary sync control (62 pages)
Control Unit Eaton 9395 Installation And Operation Manual
Sync control (42 pages)
UPS Eaton 9393PM User And Installation Manual
Sync control (34 pages)
UPS Eaton Power Xpert 9395P Installation Manual
High performance field installed upm (32 pages)
UPS Eaton Power Xpert 9395P Mechanical Installation Manual
Field installed upm (31 pages)
UPS Eaton 9395 Installation Instructions And Operators Manual
1000–1200 kva (4 pages)
UPS Eaton Powerware 9395 Plus 1 Installation And Operation Manual
225–275 kva powerware series (186 pages)
UPS Eaton Power Xpert 9395P 250 kVA User And Installation Manual
(170 pages)
UPS Eaton Power Xpert 9395P-600/600 Installation And Operation Manual
(226 pages)
UPS Eaton Power Xpert 9395P-900 Series Installation And Operation Manual
High performance ups (232 pages)
UPS Eaton Power Xpert 9395 High Performance Installation And Operation Manual
(246 pages)
Related Content for Eaton Power Xpert 9395P
9355 Series Table 1. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 9355 Series
93PM Table 1. Air Conditioning Or Ventilation Requirements During Full Load Operation (400V)
Eaton 93PM
9EHD-33-40/20 Table 3-4 Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 9EHD-33-40/20
Power Xpert 9395 Table 3-3: Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton Power Xpert 9395
93PM UPS Table 3-1. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PM UPS
93E MK2 Table 3-4. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93E MK2
9395-275 Table 3-3: Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 9395-275
93E UPS Table 3-4. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93E UPS
93PR Table 3-3: Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PR
93PR Table 3-4: Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PR
9155 UPS Table 1. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 9155 UPS
93PR Series Table 3-4. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PR Series
93PM Table 3-1. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PM
93PM-L Table 3-1. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93PM-L
Power Xpert 9395P 250 kVA Table 3-3: Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton Power Xpert 9395P 250 kVA
93E XL Table 3-4. Air Conditioning Or Ventilation Requirements During Full Load Operation
Eaton 93E XL
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL