Table 3-4. Air Conditioning Or Ventilation Requirements During Full Load Operation - Eaton 93E UPS Installation And Operation Manual

15–80 kva (380/400/415v)
Table of Contents

Advertisement

UPS Installation Plan and Unpacking
If battery systems are located in the same room as the UPS, the battery manufacturer's
environmental requirements should be followed if they are more stringent than the UPS
requirements. Operating temperatures above the recommended range will result in decreased
battery life and performance, and may reduce or void the battery warranty.
The UPS ventilation requirements are shown in Table 3-4.

Table 3-4. Air Conditioning or Ventilation Requirements During Full Load Operation

93E-15UI-N-64×9Ah-MBS
93E-15UI-N-0-MBS
93E-15U-N-MBS
93E-15UT-N-MBS
93E-20I-N-64×9Ah-MBS
93E-20I-N-0-MBS
93E-20-N-MBS
93E-20T-N-MBS
93E-30I-N-96×9Ah-MBS
93E-30I-N-0-MBS
93E-30-N-MBS
93E-30T-N-MBS
93E-40I-N-128×9Ah-MBS
93E-40I-N-0-MBS
93E-40-N-MBS
93E-40T-N-MBS
93E-60-N-MBS
93E-60T-N-MBS
93E-80-N-MBS
93E-80T-N-MBS
3-4
Eaton 93E UPS (15-80 kVA, 380/400/415V) Installation and Operation Manual
Model
Model
15 kVA
15 kVA
15 kVA
15 kVA
20 kVA
20 kVA
20 kVA
20 kVA
30 kVA
30 kVA
30 kVA
30 kVA
40 kVA
40 kVA
40 kVA
40 kVA
60 kVA
60 kVA
80 kVA
80 kVA
CAUTION
Input / Output Voltage
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
380/380 400/400 415/415
Heat Rejection
BTU/hr x1000 (kg-cal/hr)
862
862
862
1306
1149
1149
1149
1743
1723
1723
1723
2612
2298
2298
2298
3482
3447
5224
4596
6965