New Construction - COMBITHERM CTP10-20E Installation Manual

Hide thumbs Also See for CTP10-20E:
Table of Contents

Advertisement

New Construction

Designer/Consultant Responsibilities: Pre-Installation
Complete water analysis to be conducted to ensure water quality meets manufacture specifications.
Proper floor drain within 3' (914mm), not directly underneath, of where the appliance is to be installed.
Minimum of one (1) 3/4" cold water supply line—two (2) recommended—with 3/4" shut off valve installed ahead of a
minimum of two (2) 3/4" NPT connections.
Gas appliances require one 3/4" line within 3' (914mm) of the appliance equipped with a manual shut o , and ready to be
hooked to a 3/4" quick disconnect hose.
Vent hood, and possible interconnection with gas supply as determined by local code.
Proper electrical voltage, phase, wire size, breaker size, and disconnects are provided for hook ups within 3' (914mm) of
the appliance.
Exhaust air for gas appliances, exhaust hood, ventilation ceiling, chimney, spacing from top edge of appliance to lower
edge of grease filters/ceiling.
If floor is to be sloped then level surface must be provided for trolley/cart appliances.
Confirm clearances of hallways, and doors to the installation area are su icient for the model of the appliance
being installed.
Installer Responsibilities: Pre-Installation
Pre-Installation check sheet has been properly filled out.
Inspect, receive, deliver, uncrate, and set appliance in place.
Installer Responsibilities: Installation
Check that the appliance is level. Follow leveling instructions found in the installation manual.
Make final water connections to both 3/4" cold water lines with required 30 psi minimum dynamic and 90 psi maximum
static (2.1–6.3 bar) making sure treated and untreated are hooked up properly to the correct fittings.
Hook up final electrical, check for proper voltage, phase, wire size, and breaker size. Ground fault or residual current
protection device must accommodate a leakage current of 20mA. Report any issues to the designer / consultant.
Plumb in the appliance drain per the required specifications found in the installation manual.
Ensure gas pressure is above minimum and below maximum pressures listed in the installation manual for the
corresponding gas type.
Check that all accessories are unpackaged and set up for the end user.
Ensure combi appliance is properly fastened to the ground, or has a restraint installed if on casters.
Test that the CombiOven is fully operational, report any issues or manufacturing defects.
Ensure most current so ware is installed.
Pick up any packaging trash and debris from the installation.
Clean and wipe down the outside of the appliance and make presentable to the end user.
Take pictures of the installation verifying proper drain, water lines, and clearances are met.
ASA Responsibilities: A er Install
Perform mechanical startup.
Complete post installation check sheet.
Pictures of the install's electrical connections, water, drain, and clearances should be taken and sent to:
installation_program@alto-shaam.com
RSP/Dealer: A er Install
Confirm installation is correct.
Provide operational training and demonstration, and contact information for post installation support.
Verify warranty registration documentation has been submitted.
Customer/End User
Complete and submit warranty registration documentation:
Use the appliance only for its intended purpose.
Follow cleaning and planned maintenance schedules to maximize the life of the equipment.
MN-35947
Rev 12
Installation Duties and Responsibilities
11/16
Combitherm® CT PROformance™ and CT Classic Series Installation Manual
www.alto-shaam.com/warranty
9

Advertisement

Table of Contents
loading

Related Products for COMBITHERM CTP10-20E

Table of Contents