Section 5: Install The Swing Sidelite - Nabco GT1175 Quick Setup Manual

Hurricane slide door system
Hide thumbs Also See for GT1175:
Table of Contents

Advertisement

GT1175 (H105 Medium) Hurricane Quick Set-Up and Parts Guide
P/N C-00106
4 .3 Install the Floor Bracket
1. Insert the Threshold Bracket into the Bottom Rail so the plate portion with (2) screw holes sticks out from underneath in
direction of where the Slide door is to be installed.
2. Ensure the Fixed Panel is still parallel to the chalk line so it remains square.
3. Secure the Threshold Bracket to the Strike Stile with (1) 1/4-20 x 5/8 inch Socket Head screw.
4. Secure the Cover Plate back onto the Strike Stile with (2) 1/4-20 x 5/8 inch Socket Head screws.
Strike S le
1/4-20 x 5/8"
Socket Head Screw
SECTION 5: INSTALL THE SWING SIDELITE
DN 0818
5 .1 Install the Bottom Pivot
1. Obtain (1) Floor Pivot, (1) 1/4-20 x 1 inch Phillips Head screw, (1) 1/4 X 2-3/4 inch Flathead Tap Con, and (1) Bushing.
2. Insert the Floor Pivot into the hole located at the bottom of the Pivot Jamb Tube.
a. The insertion end of the Floor Pivot is notched at both sides. It will be necessary to tilt the Floor Pivot to interlock the
notched sides with the Jamb Tube.
12 of 53
Strike S le
DN 1022
Threshold Bracket
FOR FIXED SIDELITE UNITS SKIP TO
Slide Door
Double Roller
Figure 16 Slide Bottom Guide Assembly into Bottom Rail
1/4-20 x 5/8"
Socket Head Screw
SECTION 6
Swing Sidelite
www.NabcoEntrances.com
BREAKOUT SIDE
Figure 17 Install the Threshold Bracket
Figure 18 Full Open Breakout
Rev 8-10-16
DN 1023

Advertisement

Table of Contents
loading

This manual is also suitable for:

H105 medium

Table of Contents