Inventory Cpx Components - Paradyne Jetstream CPX-1000 Installation And Operation Manual

Voice services platform
Hide thumbs Also See for Jetstream CPX-1000:
Table of Contents

Advertisement

1000-A2-GN22-00
Step 3
Step 4
Step 5
Step 6
Step 7
Inventory CPX
Components
February 2003
Remove the inside top shock absorber, then lift off the box sides.
Open the plastic bag covering the equipment, and push it down
into the bottom box lid.
Inspect the CPX for damage.
If damaged, return the equipment to Paradyne
Service, and Training Information
document).
Caution
The CPX weighs 90 lbs. when the module cage is fully
loaded. Shipping weight, including the packaging material
and the pallet, is 126 lbs.
Use safe lifting techniques—have another person help you to
remove the shelf from the box bottom and pallet.
With the help of another person, carefully lift the CPX enclosure
from the box and place it on a firm, stable surface.
Before beginning installation, inventory the components against
your packing list or order. If any components are missing, notify
the Technical Support Center (TSC).
Typical contents will include:
— 1 CPX Chassis
— 1 MP Card
— 2 CP Cards
— 2 HSC Cards
— STS Splitter Assembly (for STS equipped CPX)
— MP to CP cables
— CP to CP cables
— Mounting flanges, screws and other hardware
— T1 or STS cards (to order)
Check all packages received for these components. Usually, the
cards are pre-installed in the unit; some cards may be packed
separately.
3. Installing the CPX-1000
(Warranty, Sales,
at the beginning of this
3-11

Advertisement

Table of Contents
loading

Table of Contents