Paradyne Jetstream CPX-1000 Installation Manual

Voice services platform
Hide thumbs Also See for Jetstream CPX-1000:

Advertisement

®
Jetstream
CPX-1000
Voice Services Platform
Installation
Release 3.2
Document No. 1000-A2-GN20-00
September 2002

Advertisement

Table of Contents
loading

Summary of Contents for Paradyne Jetstream CPX-1000

  • Page 1 ® Jetstream CPX-1000 Voice Services Platform Installation Release 3.2 Document No. 1000-A2-GN20-00 September 2002...
  • Page 2 Copyright © 2002 Paradyne Corporation. All rights reserved. Printed in U.S.A. Notice This publication is protected by federal copyright law. No part of this publication may be copied or distributed, transmitted, transcribed, stored in a retrieval system, or translated into any human or computer language in any form or by any means, electronic, mechanical, magnetic, manual or otherwise, or disclosed to third parties without the express written permission of Paradyne Corporation, 8545 126th Ave.
  • Page 3 Important Safety Instructions 1. Read and follow all warning notices and instructions marked on the product or included in the manual. 2. Slots and openings in the cabinet are provided for ventilation. To ensure reliable operation of the product and to protect it from overheating, these slots and openings must not be blocked or covered.
  • Page 4 CANADA – EMI NOTICE: This Class A digital apparatus meets all requirements of the Canadian interference-causing equipment regulations. Cet appareil numérique de la classe A respecte toutes les exigences du réglement sur le matérial brouilleur du Canada. CE Marking When the product is marked with the CE mark on the equipment label, a supporting Declaration of Conformity may be downloaded from the Paradyne World Wide Web site at www.paradyne.com.
  • Page 5 Table of Contents September 2002...
  • Page 6 Table of Contents 1000-A2-GN20-00 September 2002...
  • Page 7 1000-A2-GN20-00 Table of Contents September 2002...
  • Page 8 Table of Contents 1000-A2-GN20-00 September 2002...
  • Page 9: List Of Figures

    List of Figures September 2002...
  • Page 10 List of Figures 1000-A2-GN20-00 September 2002...
  • Page 11: List Of Tables

    List of Tables September 2002...
  • Page 12 List of Tables 1000-A2-GN20-00 viii September 2002...
  • Page 13 Audience Organization 7KH &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ September 2002 &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ Preface &3;...
  • Page 14 Preface Related Documents Title &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QWURGX.WLRQ DQG 7H.KQL.DO 'HV.ULSWLRQ &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ &3; 9RL.H 6HUYL.HV 3ODWIRUP 6HUYL.H -HW&UDIW 8VHUªV *XLGH -HW9LVLRQ 8VHUªV *XLGH Purpose 1000-A2-GN20-00 September 2002...
  • Page 15 Manual September 2002 Warning Alerts you to an action or inaction that could lead to an injury to yourself or damage to the CPX-1000. CAUTION CLASS 1 LASER Alerts you to a laser hazard and instructs you to avoid looking directly into the source of a coherent light (i.e., laser)
  • Page 16 Alerts you to an electrical hazard that could result in a fatal injury. Caution Alerts you to a lifting hazard that could result in physical injury. Caution Do not apply power to the CPX-1000 shelf until you have completed all the installation procedures in this manual. 1000-A2-GN20-00 PXVW September 2002...
  • Page 17 Equipment September 2002 Danger: Shock Hazard The CPX-1000 uses a 48 Vdc or a 60 Vdc Plant Battery for primary power. This voltage is sufficient to overcome skin resistance and can supply a fatal current level. Use extreme caution when working around this voltage, during installation, operation, testing, and adjusting.
  • Page 18 Caution The CPX-1000 shelf weighs 33.5 Kg (74 lbs.) when the card-cage is fully populated. The shelf has a shipping weight of 50 Kg (110 pounds,) including packing material and the pallet to which it is strapped.
  • Page 19 1000-A2-GN20-00 Preface September 2002...
  • Page 20 Preface 1000-A2-GN20-00 Current (20A) Warning September 2002...
  • Page 21 1000-A2-GN20-00 Preface Grounding Requirement Warning September 2002 xvii...
  • Page 22 Preface 1000-A2-GN20-00 Installation Warning xviii September 2002...
  • Page 23 1000-A2-GN20-00 Preface Jewelry Removal Warning September 2002...
  • Page 24 Preface 1000-A2-GN20-00 Lightning Activity Warning September 2002...
  • Page 25: Power Supply

    1000-A2-GN20-00 Preface Power Supply Warning September 2002...
  • Page 26 Preface 1000-A2-GN20-00 Product Disposal Warning xxii September 2002...
  • Page 27 1000-A2-GN20-00 Preface Qualified Personnel Warning September 2002 xxiii...
  • Page 28 Preface 1000-A2-GN20-00 SELV Circuit Warning xxiv September 2002...
  • Page 29 1000-A2-GN20-00 Preface September 2002...
  • Page 30 Preface 1000-A2-GN20-00 xxvi September 2002...
  • Page 31: Installation Requirements

    Installation Requirements September 2002...
  • Page 32 Installation Requirements Figure 1–1. CPX-1000 Voice Services Platform Safety Requirements 1000-A2-GN20-00 0162 September 2002...
  • Page 33 1000-A2-GN20-00 Installation Requirements Rack Requirements IURQW Aisle Requirements Equipment Dimensions and Weight Ventilation Considerations September 2002...
  • Page 34 Ethernet CPCI CPCI DIAG DIAG DIAG DIAG DIAG Compact PCI OUT OF SERVICE SERVICE SERVICE Figure 1–2. CPX-1000 Elevation and Profile 17 inches TELCO MINOR MAJOR CRITICAL ALARM OUT OF OUT OF OUT OF OUT OF OUT OF OUT OF...
  • Page 35 1000-A2-GN20-00 EIA310 Figure 1–3. Optional CPX-1000 Mounting Flanges September 2002 EIA310 Bell Wide 4.0 in. (ref) 5.25 in. (ref) 5.0 in. (ref) 7.5 in. (ref) 5.0 in. (ref) Bell Wide Installation Requirements Bell NEBS Narrow 2000 4.0 in. (ref) 5.25 in. (ref) 3.0 in.
  • Page 36: Environmental Requirements

    Installation Requirements Environmental Requirements Power Requirements 1000-A2-GN20-00 September 2002...
  • Page 37 1000-A2-GN20-00 Tools and Supplies Requirements Facility Connections September 2002 Installation Requirements...
  • Page 38 Installation Requirements 1000-A2-GN20-00 Table 1–1. Connection Requirements and Physical Layer Specifications Connections Cables, Connectors, and Specifications September 2002...
  • Page 39 1000-A2-GN20-00 Installation Requirements Table 1–1. Connection Requirements and Physical Layer Specifications Connections Cables, Connectors, and Specifications September 2002...
  • Page 40 Installation Requirements Table 1–2. Ethernet LAN Jack Pin Assignments Table 1–3. E1 Transition Module Pin Assignments Table 1–4. Remote Alarm Connector Pin Assignments 1-10 Signal Signal Signal 1000-A2-GN20-00 Signal Signal September 2002...
  • Page 41 1000-A2-GN20-00 System Alarm Connection Requirements September 2002 Installation Requirements 1-11...
  • Page 42 Installation Requirements 1000-A2-GN20-00 1-12 September 2002...
  • Page 43 Installing the CPX-1000 September 2002...
  • Page 44 Installing the CPX-1000 Summary Alarm Panel Power Supply/Fan Figure 2–1. CPX-1000 Front and Rear Front Module Cage Assemblies Grounding Phillips Screws 1000-A2-GN20-00 Rear Module Cage Rear View Power Distribution Plant Battery Terminals 0399 September 2002...
  • Page 45 1000-A2-GN20-00 Unpacking and Inspecting the CPX-1000 for Damage Step 1 Step 2 Step 3 Step 4 Step 5 September 2002 Installing the CPX-1000 EHIRUH...
  • Page 46 Installing the CPX-1000 1000-A2-GN20-00 0088b Figure 2–2. CPX-1000 Shipping Packaging September 2002...
  • Page 47 Flanges September 2002 Caution The CPX-1000 weighs 33.5 Kg (74 lbs.) when the module cage is fully populated. Shipping weight, including the packaging material and the pallet, is 50 Kg (110 pounds). Use safe lifting posture and have an assistant help you to remove the shelf from the box bottom and pallet.
  • Page 48 Installing the CPX-1000 Install second set of flanges after mounting shelf in rack. Figure 2–3. CPX-1000 Mounting Flanges Mounting Flanges in 23" Configuration Use second set of flanges in seismic racks with 3" deep side rails. Mounting Flanges in 19" Configuration...
  • Page 49: Rack Mounting

    Rack Mounting 30 inches clearance in front of shelf Note: Hendry Model 12300 23" rack shown for reference. Figure 2–4. CPX-1000 Rack Footprint September 2002 Top View 12.5 to 13.63 inches (adjustable) for cable management trough (shown at maximum extension) 4-51/64"...
  • Page 50 Ethernet CPCI CPCI DIAG DIAG DIAG DIAG DIAG Compact PCI OUT OF SERVICE SERVICE SERVICE Figure 2–5. CPX-1000 Elevation and Profile 17 inches TELCO MINOR MAJOR CRITICAL ALARM OUT OF OUT OF OUT OF OUT OF OUT OF OUT OF...
  • Page 51 Loosen Retaining Screws Figure 2–6. Removing the Shelf Power Supplies September 2002 Caution The CPX-1000 weighs 33.5 Kg (74 lbs.) fully loaded with cards. To avoid possible injury, have another person assist you with enclosure mounting. Fan Sled Installing the CPX-1000...
  • Page 52 Danger The –48 VDC or 60 VDC plant battery output presents a potentially fatal shock hazard. Use extreme caution when connecting it to the CPX-1000 and other equipment that requires plant battery for operation. Electro-Static Caution Use a wrist grounding strap, attached to the grounding jack on the CPX-1000 enclosure, when working with the system.
  • Page 53 1000-A2-GN20-00 Plant Battery "A" Figure 2–7. CPX-1000 Plant Battery Connections Step 1 Step 2 Step 3 September 2002 Open Protective Guards DC -48V DC -48V Frame Plant Circuit Ground Battery A Breaker Points Barrier Strip (requires 10-32 x 1/4" screws)
  • Page 54 Installing the CPX-1000 Step 4 Step 5 Step 6 Step 7 2-12 Caution Be sure to observe proper polarity when making the connections. Damage may occur to the circuitry when powered up if not installed correctly. 1000-A2-GN20-00 September 2002...
  • Page 55 1000-A2-GN20-00 Install Modules in CPX September 2002 Installing the CPX-1000 2-13...
  • Page 56 Installing the CPX-1000 Installing Additional Modules Step 1 Step 2 Figure 2–8. CPX-1000 Module Extractors Step 3 Step 4 2-14 Voice/Data Interruption 1000-A2-GN20-00 September 2002...
  • Page 57 1000-A2-GN20-00 Attaching ATM Cables Attaching STM-1 Cables Step 1 Step 2 September 2002 Installing the CPX-1000 2-15...
  • Page 58 Installing the CPX-1000 Figure 2–9. STM-1 Fiber Optic ATM Connections 2-16 Status Status LEDs ATM 155 ATM OC-3 SC Ports 0160 1000-A2-GN20-00 Dust Cover September 2002...
  • Page 59 Figure 2–10. DS-3 Coaxial Cable ATM Connections September 2002 DS3 Transition DS3 Splitter Modules Modules R0004 R0004 R0004 R0004 LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ FROM Rear View of CPX Shelf Installing the CPX-1000 Coaxial Cables to Packet Switch FROM 0235 2-17...
  • Page 60 Installing the CPX-1000 Figure 2–11. Partially Redundant CPX-1000 Cabling 2-18 Transition Splitter Modules Module R0004 R0004 LOS/ AIS/ LOS/ AIS/ Rear View of CPX Shelf 1000-A2-GN20-00 Coaxial Cables to Packet Switch FROM 0246 September 2002...
  • Page 61 LINK LINK LINK LINK LINK Ethernet Ethernet Ethernet Ethernet 663J CPCI CPCI DIAG DIAG DIAG DIAG DIAG Installing the CPX-1000 Signal STATUS STATUS Status Status Status Status Attach cable here LOS/ LOS/ LOS/ LOS/ Hot Swap Hot Swap Hot Swap...
  • Page 62 Installing the CPX-1000 Connecting the CPX-1000 to the Step 1 Step 2 Figure 2–13. MP and Transition Cards (Reference) 2-20 Management Processor (Shelf Front) Transmit Link Status LEDs 10/100 ETHERNET Receive RESET 1000-A2-GN20-00 Management Processor Transition Card (Shelf Rear) Attach serial modem...
  • Page 63 PORTS PORTS LINK LINK LINK LINK Ethernet Ethernet Ethernet Ethernet 663J CPCI CPCI DIAG DIAG DIAG DIAG Hot Swap Installing the CPX-1000 TELCO MAJOR CRITICAL ALARM DISABLED DISABLED DISABLED DISABLED DISABLED UNLOCKED UNLOCKED UNLOCKED UNLOCKED UNLOCKED STATUS STATUS Status Status...
  • Page 64 Installing the CPX-1000 Attaching Cables to the Octal E1 Modules Step 1 Step 2 Step 3 2-22 1000-A2-GN20-00 September 2002...
  • Page 65 LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ FROM FROM 16 15 14 13 12 11 10 Slot Numbers Installing the CPX-1000 E1 Transition Module Modules ETHERNET 2 ETHERNET 1 0445 Module E1 Transition Modules ETHERNET 2 ETHERNET 1 0409...
  • Page 66 Installing the CPX-1000 Figure 2–17. Octal E1 Transition Card Table 2–2. E-1 Transition Module Pin Assignments 2-24 Pins Assignments 1000-A2-GN20-00 September 2002...
  • Page 67 Note: Route power and PSTN cables on opposites sides of shelf. Figure 2–18. Suggested E1 Cable Dressing September 2002 BONDING POINT ETHERNET 2 ETHERNET 1 E1 PSTN Cables Note: For clarity, not all cables are shown. Installing the CPX-1000 to cable ladders 0410 2-25...
  • Page 68 Installing the CPX-1000 Mounting Ear faces away from shelf Figure 2–19. Optional Cable Management Assembly 2-26 23" Rack Mounting Ear faces in toward shelf 1000-A2-GN20-00 19" Rack September 2002 0188...
  • Page 69 1000-A2-GN20-00 Attaching Cables to 12-Port E1 Modules Step 1 Step 2 Step 3 September 2002 RJ-21X Port Pin Specifications Tip pins 1 Ring pins 26 through 25 E1 circuit #1 E1 circuit #2 0488-01 Installing the CPX-1000 through 50 2-27...
  • Page 70 Installing the CPX-1000 Office Alarm Connections System Status Indicators SYSTEM ALERTS ALERT A Alarm DISABLED DISABLED Panel UNLOCKED UNLOCKED Figure 2–20. Alarm Indicators and Output Connection 2-28 Telco Alarm Indicators ALERT B ALERT C DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED...
  • Page 71 1000-A2-GN20-00 Installing the CPX-1000 Table 2–3. Alarm Indicator Color and Status Alarm Indicator Status Color Description Table 2–4. Remote Alarm Connector Signal September 2002 2-29...
  • Page 72 Installing the CPX-1000 Provisioning the CPX-1000 2-30 -HW&UDIW 8VHUªV *XLGH 1000-A2-GN20-00 September 2002...
  • Page 73 Verifying Installation Step 1 September 2002 Verification Testing...
  • Page 74 Verification Testing Alarm DISABLED Panel UNLOCKED FAIL PORTS Card Cage LINK Ethernet DIAG Power Supplies Cooling Fans Figure 3–1. Fully-redundant STM-1 Shelf (Front View) SYSTEM ALERTS ALERT A ALERT B ALERT C MINOR DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED DISABLED...
  • Page 75 1000-A2-GN20-00 Alarm ALERT A DISABLED DISABLED Panel UNLOCKED UNLOCKED FAIL FAIL PORTS PORTS Card Cage LINK LINK Ethernet Ethernet DIAG DIAG Power Supplies Cooling Fans Figure 3–2. Fully-redundant DS-3 Shelf (Front View) Step 2 Step 3 Step 4 Step 5 September 2002 SYSTEM ALERTS TELCO...
  • Page 76 Verification Testing ESD Wrist Strap Grounding Jack Frame Ground Points (requires 10-32 x 1/4" screws) Figure 3–3. Fully-redundant STM-1 Shelf (Rear View) E1 Transition Modules MP Transition Module BONDING POINT Plant Battery A Circuit Barrier Strip Breaker (Behind Protective Guard) 1000-A2-GN20-00 ETHERNET 2 ETHERNET 1...
  • Page 77 1000-A2-GN20-00 ESD Wrist Strap Grounding Jack Frame Ground Points (requires 10-32 x 1/4" screws) Figure 3–4. Fully-redundant DS-3 Shelf (Rear View) September 2002 DS3 Transition Modules Splitter Modules BONDING POINT R0004 R0004 R0004 R0004 LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ FROM...
  • Page 78: Step 1

    Verification Testing Verifying the Interconnect Cabling Power and Ground Wiring Plant Battery "A" Figure 3–5. Power and Ground Wiring Step 1 Open Protective Guards DC -48V DC -48V Frame Plant Circuit Ground Battery A Breaker Points Barrier Strip (requires 10-32 x 1/4" screws) 1000-A2-GN20-00 DC -48V...
  • Page 79 1000-A2-GN20-00 Step 2 Step 3 Step 4 Step 5 ATM Cabling September 2002 Status Status LEDs ATM 155 ATM OC-3 SC Ports Dust Cover 0160 Verification Testing...
  • Page 80: Tx1 Tx1

    Verification Testing Figure 3–6. ATM Module Connectors, STM-1 Fiber Optic Figure 3–7. ATM Connections, DS-3 Coaxial Cables DS3 Transition DS3 Splitter Modules Modules R0004 R0004 R0004 R0004 LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ FROM Rear View of CPX Shelf 1000-A2-GN20-00 Coaxial Cables to Packet Switch...
  • Page 81: Table Of Contents

    1000-A2-GN20-00 Ethernet LAN Cabling Figure 3–8. Ethernet LAN Connections on Management Processor Transition Card September 2002 Management Processor Transition Board ETHERNET 2 Receive Link ETHERNET 1 Status LEDs ETHERNET 1 Transmit 0208 Verification Testing...
  • Page 82 Verification Testing Host Switch E1 Cabling 10-32 x 1/4" screws) Figure 3–9. Fully-redundant STM-1 Shelf (Rear View) 3-10 ESD Wrist Strap MP Transition Module Grounding Jack BONDING POINT Frame Plant Battery A Ground Points Barrier Strip (requires (Behind Protective Guard) 1000-A2-GN20-00 E1 Transition Modules ETHERNET 2...
  • Page 83: Ethernet 2

    1000-A2-GN20-00 ESD Wrist Strap Grounding Jack Frame Ground Points (requires 10-32 x 1/4" screws) Figure 3–10. Fully-redundant DS-3 Shelf (Rear View) September 2002 DS-3 Transition DS-3 Modules Splitter Modules BONDING POINT R0004 R0004 R0004 R0004 LOS/ AIS/ LOS/ AIS/ LOS/ AIS/ LOS/ AIS/...
  • Page 84 Verification Testing 1000-A2-GN20-00 Figure 3–11. Octal E1 Transition Module Connections Table 3–1. E1 Transition Module Pin Assignments Signal Signal 3-12 September 2002...
  • Page 85: Applying Power

    1000-A2-GN20-00 Applying Power Step 1 Step 2 Step 3 Step 4 Checking the CPX-1000 Plug-in Module Indicators September 2002 POWER INPUT Verification Testing 3-13...
  • Page 86: Processor

    Verification Testing Call Processor (CP) Indicators Figure 3–12. CP Module Indicators 3-14 Control Processor Module RJ-45 Ethernet Port Receive Link Status LEDs Transmit CP Status LEDs CPCI 1000-A2-GN20-00 Hot Swap Controller Module ERROR 0149 September 2002...
  • Page 87 Table 3–2. CP Module Indicators Cards Indicators LAN 0 LAN 1 CPCI ERROR September 2002 OK when Function Voice/Data Interruption Do not press the button on the CP module. Doing so could reset the CPX-1000 shelf and interrupt all calls. Verification Testing 3-15...
  • Page 88 Verification Testing Management Processor (MP) Indicators Transmit Link Status LEDs Receive Figure 3–13. Management Processor Module 3-16 Management Processor (Shelf Front) 10/100 ETHERNET RESET 1000-A2-GN20-00 Management Processor Transition Card (Shelf Rear) ETHERNET 2 ETHERNET 1 0449 September 2002...
  • Page 89 1000-A2-GN20-00 Table 3–3. MP Module Indicators Table 3–4. Ethernet Port Pin Assignments September 2002 Indicator Color Function Link Signal Verification Testing Signal 3-17...
  • Page 90 Verification Testing ATM Module Indicators ATM STM-1 Module Status LEDs Figure 3–14. ATM STM-1 Module 3-18 Status ATM 155 ATM STM-1 SC Ports Hot Swap Indicator 0406 1000-A2-GN20-00 Dust Cover September 2002...
  • Page 91 1000-A2-GN20-00 Table 3–5. ATM STM-1 Module Indicators September 2002 Indicators Function Status Hot Swap CAUTION CLASS 1 LASER Use of controls, adjustment, or performance of procedures other than those specified herein may result in hazardous, invisible radiation exposure. Do not look directly into fiber optic connector socket or you may seriously harm your eyes.
  • Page 92 Verification Testing ATM DS-3 Module DS-3 Card Figure 3–15. ATM DS-3 Module 3-20 R0004 Status DS3 Ports LOS/ AIS/ Status LEDs LOS/ Hot Swap 0177 0243 DS-3 Transition Card 1000-A2-GN20-00 FROM 0244 DS-3 Splitter Assembly September 2002...
  • Page 93 1000-A2-GN20-00 Table 3–6. ATM DS-3 Module Indicators Cards Indicator Status LOS/LOF Hot Swap LOS/LOF AIS/RAI September 2002 Verification Testing Function 3-21...
  • Page 94 Verification Testing Octal E1 Module Indicators Figure 3–16. Octal E1 and E1 Transition Cards 3-22 FAIL PORTS LINK Ethernet DIAG Hot Swap Indicator 0161 1000-A2-GN20-00 September 2002...
  • Page 95 1000-A2-GN20-00 Table 3–7. Octal E1 Module Indicators Cards Indicator FAIL 1 8 PORTS LINK Ethernet Blue Power Table 3–8. E1 Transition Module Pin Assignments Signal September 2002 Function Signal Verification Testing 3-23...
  • Page 96 Verification Testing Step 1 Step 2 Step 3 Step 4 Step 5 3-24 FAIL 8 E1 LINK 1000-A2-GN20-00 September 2002...
  • Page 97 1000-A2-GN20-00 12-Port E1 Module Indicators Figure 3–17. 12-port E1 ECAC and E1 Transition Cards September 2002 TDM-12E1/T1 12-port E1 ECAC Card RJ-21X SWAP 0478-01 Verification Testing RS-232 10 BT ETH 12-port E1 ECAC 12 PORT E1 Port PCM TEST BITS 0479-01 3-25...
  • Page 98 Verification Testing Table 3–9. 12-port E1 ECAC Module Controls, Indicators, and Ports Cards Controls, Indicators, and Ports STAT T1 Port Indicators (12) Hot Swap RJ-21X PORT for 12 E1s 10 BT ETH BITS PCM TEST RS-232 Step 1 Step 2 Step 3 3-26 Function...
  • Page 99 1000-A2-GN20-00 Echo Cancellation Module Indicators Figure 3–18. Echo Cancellation Module September 2002 Status STATUS Hot Swap Indicator (Blue) 0179 Verification Testing 3-27...
  • Page 100 Verification Testing ECAC Module Indicators Figure 3–19. ECAC Card 3-28 Status STATUS 0152 1000-A2-GN20-00 September 2002...
  • Page 101 1000-A2-GN20-00 Alarm Panel Indicators Step 1 Step 2 Checking the Fans Verifying the Remote Interface Connecting the JetCraft Terminal to the CPX-1000 -HW&UDIW 8VHUªV *XLGH September 2002 -HW&UDIW WHUPLQDO Verification Testing 3-29...
  • Page 102 Verification Testing Changing the CPX-1000 Default IP Address Verifying the CPX-1000 LAN Connection Step 1 Step 2 Step 3 Step 4 3-30 -HW&UDIW 8VHUªV *XLGH C:\wnnt\system32>ping 10.0.2.2 Pinging 10.0.1.32 with 32 bytes of data: Reply from 10.0.1.32: bytes=32 time<10ms TTL=128 Reply from 10.0.1.32: bytes=32 time<10ms TTL=128...
  • Page 103: Troubleshooting

    Power Problems Frame Ground Points (requires 10-32 x 1/4" screws) Figure 4–1. CPX-1000 Circuit Breaker September 2002 Troubleshooting Installation Faults Plant Battery A Barrier Strip (Behind Protective Guard) Circuit Plant Battery B Breaker Barrier Strip (Behind Protective Guard) 0068...
  • Page 104 Troubleshooting Installation Faults System Does Not Power Up Table 4–1. Power Failure Troubleshooting Symptom Plant Battery "A" Figure 4–2. Power and Ground Connections Probable Causes Corrective Action DC -48V DC -48V Frame Plant Ground Battery A Points Barrier Strip (requires 10-32 x 1/4"...
  • Page 105 Table 4–3. CP Module Troubleshooting Symptom September 2002 Voice/Data Interruption Do not press the button on the CP module. Doing so could reset the CPX-1000 shelf and interrupt all calls. Probable Causes Corrective Action Probable Causes Corrective Action Troubleshooting Installation Faults...
  • Page 106 Troubleshooting Installation Faults Table 4–4. MP Module Troubleshooting Symptom Table 4–5. E1 Module Troubleshooting Symptom Probable Causes Corrective Action Probable Causes Corrective Action 1000-A2-GN20-00 September 2002...
  • Page 107 1000-A2-GN20-00 Table 4–5. E1 Module Troubleshooting (Continued) Symptom FAIL FAIL FAIL September 2002 Probable Causes Corrective Action Troubleshooting Installation Faults FAIL FAIL...
  • Page 108 Troubleshooting Installation Faults Table 4–6. ATM Module Troubleshooting Symptom Probable Causes Corrective Action 1000-A2-GN20-00 STATUS September 2002...
  • Page 109: Replacing Modules

    1000-A2-GN20-00 Replacing Modules Removing a Module Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 September 2002 Voice/Data Interruption Do not press the card extractors unless the card is being taken out of service. Pressing the card extractors removes the card from service and causes voice/data interruption unless you use proper Hot Swap procedures when the cards are in service.
  • Page 110 Troubleshooting Installation Faults Power Supply Sleds Loosen Retaining Screws Figure 4–3. Removing a Power Supply Figure 4–4. Module Extractors Fan Sled Pull To Remove 1000-A2-GN20-00 0071 September 2002...
  • Page 111 1000-A2-GN20-00 Installing a Module Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 September 2002 Caution Insert the fan/power supply module with a single, steady motion. Bouncing the module during insertion can cause an alarm condition in the system. Also, do not force the module into the slot.
  • Page 112 Troubleshooting Installation Faults 1000-A2-GN20-00 Ethernet LAN Failures RCV) Table 4–7. Ethernet LAN Troubleshooting Symptom Probable Causes Corrective Action 4-10 September 2002...
  • Page 113 Checklists September 2002...
  • Page 114 Checklists Installation Checklist " " " " Task 1000-A2-GN20-00 Page Ref September 2002...
  • Page 115 1000-A2-GN20-00 Acceptance Test Checklist " " " " Task September 2002 Checklists Page Ref...
  • Page 116 Checklists Turn-up Checklist " " " " Task -HW&UDIW 8VHUªV *XLGH 1000-A2-GN20-00 September 2002...
  • Page 117 Equipment Specifications Parameter Specification Physical Environmental September 2002...
  • Page 118 Equipment Specifications Parameter Operating Electrical Specification 1000-A2-GN20-00 September 2002...
  • Page 119 1000-A2-GN20-00 Parameter PSTN Connections Packet Network Connection (STM-1 Optical) September 2002 Specification Equipment Specifications...
  • Page 120 Equipment Specifications Parameter ATM Packet Network (DS-3 Coaxial Cables) Ethernet LAN Alarm Output Connection Specification 1000-A2-GN20-00 September 2002...
  • Page 121 Logging In Step 1 September 2002 Console User Commands Type of access Start User Name Password...
  • Page 122 Console User Commands Step 2 Step 3 Enter user name and password here Indicates the current CP selected and its status Figure C–1. Console Window Table C–1. CP High Availability States State Description 1000-A2-GN20-00 September 2002...
  • Page 123 1000-A2-GN20-00 Step 4 Figure C–2. A Sample Listing of Console Commands Cpx> ? — Displays a summary of all user or admin Cpx>? <command name> — Displays detailed help on Cpx> <command-name>? — Displays detailed help about Step 5 User Console Commands September 2002 commands...
  • Page 124 Console User Commands exit help setpassword showadminstate showclock showecac showport showportgroups showpps showpstnpg stats status v5ifstat v5lnstat v5protstat version 1000-A2-GN20-00 September 2002...
  • Page 125 1000-A2-GN20-00 clocking crv <ifg> all exit help setpassword Setpassword<username><new password> September 2002 Cpx> clocking Cpx> exit Cpx> help — Displays a summary of all the commands available Cpx> help <command name> — Displays detailed Cpx> <command-name> help — Displays detailed Example: [A:AC] cpx.
  • Page 126 Console User Commands showadminstate showclock showecac showport showportgroups showpps showpstnpg stats Cpx> showadminstate portgroups Cpx> showadminstate ports Cpx> showclock Cpx> showecac Cpx> showport Cpx> showportgroups Cpx> showpps Cpx> showpps Cpx> stats sys Cpx> stats ifg <ifg> Cpx> stats ds1 <ifg> <ds1> 1000-A2-GN20-00 September 2002...
  • Page 127 1000-A2-GN20-00 status v5ifstat v5lnstat v5prostat September 2002 Cpx> stats sub <sub> Cpx> stats port <sub> <port> Cpx> stats atm <device> Cpx> status software — Displays status of the system software links Cpx> status atm — Displays status of ATM ports and portgroups Cpx>...
  • Page 128 Console User Commands Admin Console Commands clearstats portloop reboot restartsub setactiveport setcdv setechocancel setlinelen vpath clearstats Cpx> clearstats sys Cpx> clearstats ifg <ifg> Cpx> clearstats ds1 <ifg> <ds1> Cpx> clearstats sub <sub> Cpx> clearstats port <sub> <port> Cpx> clearstats atm <device> 1000-A2-GN20-00 September 2002...
  • Page 129 1000-A2-GN20-00 portloop reboot restartsub setactiveport September 2002 Cpx> fan — Displays the current speed of all the PowerSupply fans Cpx> fan [1-3|all] stat — Displays the current fan speed Cpx> fan [1-3|all] low|high — Sets the fan speed to Low or High all = all fans (the default) Cpx>...
  • Page 130 Console User Commands setcdv setechocancel setlinelen C-10 Cpx> setcdv — Displays current Cell Delay Variation Cpx> setcdv <newcdv> — Sets a new Cell Delay Variation <newcdv> = Maximum jitter to tolerate in received cells from subscribers (in milliseconds) Cpx> setechocancel <sub> <port> none|far — Sets Echo Cancellation for one port on a subscriber Cpx>...
  • Page 131 1000-A2-GN20-00 vpath September 2002 Cpx> tap — Shows currently configured taps Cpx> tap on <timeslot> <T1/E1card> <T1/E1port> <ds0> — Monitor <timeslot> on the specified E1 DS0 Cpx> tap off <timeslot> — Disable existing tap on <timeslot> <timeslot> = H.110 timeslot to tap (0-4095, get from sub or crv displays) <T1/E1card>...
  • Page 132 Console User Commands 1000-A2-GN20-00 C-12 September 2002...
  • Page 133 Numerics 1-6, 1-8 2-10, 2-11 2-28 3-24 3-30 3-30 3-29 1-11 2-28 2-28 3-29 1-11 2-28 2-28 1-11 2-28 2-28 2-28 xi, xii, xiv September 2002 3-25 1-6, 1-8, 1-9 Index 3-29 3-13 3-29 3-18 2-15 2-16, 2-17 1-10, 3-12, 3-23 2-28 2-10, 2-11 2-12...
  • Page 134 Index 2-15 4-10 2-11 3-29 2-22 3-29 xi, xii, xiv 3-30 3-29 2-1, 3-1 1-7, 2-11, 4-1 2-28 2-15 3-12 2-19 2-22, 2-27 3-29 2-10, 2-11 4-3, 4-4 2-28 3-14 3-25 3-18 3-22 4-3, 4-4 2-19 4-10 3-14, 3-16 4-3, 4-4, 4-5, 4-6, 4-10 1000-A2-GN20-00 3-29 2-10, 2-11...
  • Page 135 1000-A2-GN20-00 xii, xiii, 2-10 4-10 2-19 3-30 4-10 3-29 1-10, 2-19, 3-17 1-9, 1-11 3-24 1-11 3-29 3-29 xii, xiii 4-10 2-15 2-11 September 2002 2-10 3-29 3-24 3-29 3-24, 3-26, 4-5 3-24 3-24 3-24, 3-26 3-30 2-11 2-22, 2-27 3-24, 3-26 3-10 3-13...
  • Page 136 Index 3-29 3-29 2-22 2-19 2-19 2-11 2-11 3-18 3-22, 3-25 3-24 3-14 2-12, 2-20 2-19 2-28 2-19 1-3, 2-6 2-15 2-19 2-22, 2-27 4-10 1-11 4-10 3-29 3-29 3-10 1000-A2-GN20-00 3-22 3-22 2-28 3-19 1-11 2-28, 4-3 1-9, 2-28 2-28 1-10, 3-12, 3-23 1-10, 2-19, 3-17...
  • Page 137 1000-A2-GN20-00 3-13 xi, xii, xiv 4-3, 4-4 1-3, 2-6 1-3, 2-6 1-3, 2-6 1-3, 2-6 4-10 2-16, 2-17 2-19 1-11 2-24 2-12 3-24, 3-26 September 2002 2-28 2-10 1-11 3-19 xii, xiii 4-4, 4-5, 4-6 3-19 3-29 3-18 3-14, 3-16 3-22 4-2, 4-10 2-28, 4-3...
  • Page 138 Index 3-10, 3-11 3-13 3-19 16, 2-17 3-13 3-19 2-28 2-28 xi, xii, xiv 4-10 1000-A2-GN20-00 September 2002...

Table of Contents