3. Installing the CPX-1000
Unpack and
Inspect the
CPX-1000
Step 1
Step 2
3-10
Before unpacking your CPX, site preparation should be complete,
including installation of the rack, and network cabling ready for
connection.
Before accepting delivery of the CPX, you should inspect the
containers and the unit.
Inspect the shipping container for damage.
Cut the shipping bands and remove the top of the box.
1000-A2-GN22-00
0088b
February 2003