Paradyne CPX-1000 User Manual

Zhone jetstream cpx-1000 voip: supplementary guide
Hide thumbs Also See for CPX-1000:

Advertisement

®
Jetstream
JetCraft
User's Guide
Release 3.2
Document No. 1000-A2-GB21-00
September 2002

Advertisement

Table of Contents
loading

Summary of Contents for Paradyne CPX-1000

  • Page 1 ® Jetstream JetCraft User’s Guide Release 3.2 Document No. 1000-A2-GB21-00 September 2002...
  • Page 2 Copyright © 2002 Paradyne Corporation. All rights reserved. Printed in U.S.A. Notice This publication is protected by federal copyright law. No part of this publication may be copied or distributed, transmitted, transcribed, stored in a retrieval system, or translated into any human or computer language in any form or by any means, electronic, mechanical, magnetic, manual or otherwise, or disclosed to third parties without the express written permission of Paradyne Corporation, 8545 126th Ave.
  • Page 3 JetCraft Software License Agreement CAREFULLY READ THE FOLLOWING TERMS AND CONDITIONS. BY USING ANY OF THE JETCRAFT SOFTWARE, YOU AGREE TO BE BOUND BY THESE TERMS AND CONDITIONS. IF YOU DO NOT AGREE TO THESE TERMS AND CONDITIONS, DO NOT USE OR INSTALL ANY OF THE SOFTWARE. IN SUCH EVENT, YOU MAY RETURN THE SOFTWARE TO THE SELLER OR TO PARADYNE (UNUSED) FOR A REFUND OF THE PRICE PAID.
  • Page 4 5. Limited Warranty and Disclaimer of Warranties The media upon which any Software is contained is warranted to be free from defects in material and workmanship for a period of thirty (30) days from the date of delivery to Licensee (the “Warranty Period”). The entire liability of Paradyne (and, as applicable, its licensor(s)) and Licensee’s exclusive remedy for breach of the foregoing limited warranty shall be for Paradyne to replace any defective media which is returned to Paradyne during the Warranty Period.
  • Page 5 10. U.S. Government Restricted Rights The following terms shall apply where Licensee is an agency or unit of the U.S. government. Units of the DoD. Use, duplication or disclosure by the government is subject to restrictions as set forth in paragraph (c)(1)(ii) of the Rights in technical Data and Computer Software clause at DFARS 252.227-7013.
  • Page 6 September 2002 1000-A2-GB21-00...
  • Page 7 Table of Contents September 2002...
  • Page 8 Table of Contents 1000-A2-GB21-00 September 2002...
  • Page 9 1000-A2-GB21-00 Table of Contents September 2002...
  • Page 10 Table of Contents 1000-A2-GB21-00 September 2002...
  • Page 11 1000-A2-GB21-00 Table of Contents September 2002...
  • Page 12 Table of Contents 1000-A2-GB21-00 September 2002...
  • Page 13: List Of Figures

    List of Figures September 2002...
  • Page 14 List of Figures 1000-A2-GB21-00 viii September 2002...
  • Page 15 1000-A2-GB21-00 List of Figures September 2002...
  • Page 16 List of Figures 1000-A2-GB21-00 September 2002...
  • Page 17 1000-A2-GB21-00 List of Figures September 2002...
  • Page 18 List of Figures 1000-A2-GB21-00 September 2002...
  • Page 19: List Of Tables

    List of Tables September 2002...
  • Page 20 List of Tables 1000-A2-GB21-00 September 2002...
  • Page 21 Audience Organization September 2002 -HW&UDIW 8VHUªV *XLGH -HW&UDIW 8VHUªV *XLGH -HW&UDIW 8VHUªV *XLGH Preface xiii...
  • Page 22: Related Documents

    Preface Related Documents &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QWURGX.WLRQ DQG 7H.KQL.DO 'HV.ULSWLRQ &3; 9RL.H 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ &3; 9RL.H 6HUYL.HV 3ODWIRUP 6HUYL.H 1000-A2-GB21-00 September 2002...
  • Page 23 1000-A2-GB21-00 Symbols September 2002 Voice/Data Interruption This telephone symbol alerts you to the procedures that interrupt traffic. Preface...
  • Page 24 Preface 1000-A2-GB21-00 September 2002...
  • Page 25 JetCraft Overview September 2002...
  • Page 26: Jetcraft Features

    JetCraft Overview JetCraft Features Table 1–1. JetCraft Features Features Description 1000-A2-GB21-00 September 2002...
  • Page 27 1000-A2-GB21-00 JetCraft Overview Table 1–1. JetCraft Features (Continued) Features Description September 2002...
  • Page 28: Craft Terminal

    JetCraft Overview 1000-A2-GB21-00 CPX-1000 Components Table 1–2. Components Represented as Icons in JetCraft Icons Description Craft Terminal September 2002...
  • Page 29: Preparing For Jetcraft Installation

    Preparing for JetCraft Installation September 2002 JetCraft Installation...
  • Page 30: Installing Jetcraft

    JetCraft Installation 1000-A2-GB21-00 Table 2–1. Hardware Requirements for JetCraft Hardware Requirements Installing JetCraft Step 1 Figure 2–1. Welcome Screen September 2002...
  • Page 31 1000-A2-GB21-00 Step 2 Figure 2–2. Software Agreement License Screen Step 3 agreement Figure 2–3. Destination Folder Screen September 2002 Next Click here to continue Back I accept the terms of the license JetCraft Installation Next...
  • Page 32 JetCraft Installation Step 4 Figure 2–4. Feature Selection Screen Next Destination folder Change Next 1000-A2-GB21-00 C:\Jetstream\ September 2002...
  • Page 33: A2-Gb21

    1000-A2-GB21-00 Step 5 Figure 2–5. Ready to Install Screen Step 6 Figure 2–6. Installation Summary Screen September 2002 Next Install Now JetCraft Installation...
  • Page 34 JetCraft Installation Step 7 Figure 2–7. JetCraft Icon Step 8 Step 9 Figure 2–8. JetCraft Properties Screen Exit Properties 1000-A2-GB21-00 September 2002...
  • Page 35 1000-A2-GB21-00 Step 10 Figure 2–9. Memory Tab with Selected Value Step 11 Step 12 September 2002 Memory JetCraft Installation 32768 Select or enter 32768...
  • Page 36: September

    JetCraft Installation Starting JetCraft Step 1 Figure 2–10. JetCraft Login Dialog Box Step 2 Step 3 Step 4 CPX IP cpxuser cpxuser 1000-A2-GB21-00 User Id Password September 2002...
  • Page 37 1000-A2-GB21-00 Step 5 Figure 2–11. Login Fail Figure 2–12. JetCraft Main Screen September 2002 JetCraft Installation Cancel Login Failure message...
  • Page 38: Where To Go Next

    JetCraft Installation Where to Go Next Re-connecting to JetCraft 2-10 Re-login 1000-A2-GB21-00 September 2002...
  • Page 39: Removing Jetcraft

    1000-A2-GB21-00 Removing JetCraft Step 1 Step 2 Step 3 Figure 2–13. Add/Remove Programs Properties Screen September 2002 Start Settings Add/Remove Programs Add/Remove JetCraft Installation Control Panel 2-11...
  • Page 40 JetCraft Installation Step 4 Figure 2–14. Uninstallation Complete Screen Step 5 Figure 2–15. Feature Selection Screen 2-12 Next 1000-A2-GB21-00 September 2002...
  • Page 41 1000-A2-GB21-00 Step 6 Figure 2–16. Ready to Uninstall Screen Step 7 Figure 2–17. Uninstallation Summary Screen Step 8 Step 9 September 2002 Uninstall Now Exit JetCraft Installation Next 2-13...
  • Page 42 JetCraft Installation 1000-A2-GB21-00 2-14 September 2002...
  • Page 43 The JetCraft Main Screen September 2002 JetCraft Basic Operations...
  • Page 44: Toolbar Icons

    JetCraft Basic Operations Menu bar Toolbar Tree View Map View Alarm window Status bar Figure 3–1. JetCraft Main Screen Menu Bar Toolbar Icons Click here to create IADs Click here to perform IAD management functions Click here to create IAD Profiles Figure 3–2.
  • Page 45 1000-A2-GB21-00 JetCraft Basic Operations CPX-1000 Shelf Card Network Protection Group V5 Interface Group Figure 3–3. Tree View September 2002...
  • Page 46: Map View

    JetCraft Basic Operations Map View Figure 3–4. Map View Shelf View 6HUYL.HV 3ODWIRUP ,QVWDOODWLRQ Figure 3–5. Shelf View 1000-A2-GB21-00 &3; 9RL.H September 2002...
  • Page 47: The Alarm Window

    1000-A2-GB21-00 The Alarm Window Figure 3–6. Alarm Window Table 3–1. Alarm Color and Alarm Severity The Status Bar Displayed message Figure 3–7. Status Bar September 2002 Alarm Severity Color JetCraft Basic Operations CPX-1000 IP User ID...
  • Page 48: Jetcraft Menus

    JetCraft Basic Operations JetCraft Menus The File Menu Figure 3–8. File Menu File 1000-A2-GB21-00 September 2002...
  • Page 49: The Configuration Menu

    1000-A2-GB21-00 Configuration Menu Figure 3–9. Configuration Menu September 2002 Configuration Shown with an IG selected JetCraft Basic Operations Shown with an IAD selected...
  • Page 50: The Services Menu

    JetCraft Basic Operations The Services Menu Shown with an MP card selected Figure 3–10. Services Menu Services 1000-A2-GB21-00 Shown with CPX-1000 selected September 2002...
  • Page 51: The Report Menu

    1000-A2-GB21-00 The Report Menu Figure 3–11. Report Menu The Help Menu Figure 3–12. The Help Menu September 2002 Report Help JetCraft Basic Operations...
  • Page 52 JetCraft Basic Operations 1000-A2-GB21-00 3-10 September 2002...
  • Page 53: Understanding User Access Control

    Understanding User Access Control September 2002 Administration and User .S[XVHU .S[XVHU Management...
  • Page 54: Changing A User Password

    Administration and User Management Table 4–1. User Access Level Summary Access Level Privileges Changing a User Password Step 1 Figure 4–1. Change Password Window Step 2 Step 3 Step 4 Change CPX Password 1000-A2-GB21-00 September 2002...
  • Page 55: Creating Cpx Users

    1000-A2-GB21-00 Creating CPX Users Step 1 Figure 4–2. Create User Window Step 2 September 2002 Create CPX User Administration and User Management...
  • Page 56 Administration and User Management Step 3 Figure 4–3. Create User Window—Address Tab Step 4 Step 5 Figure 4–4. Create User Window—Contact Tab Step 6 Address Contact 1000-A2-GB21-00 September 2002...
  • Page 57: Modifying Cpx Users

    1000-A2-GB21-00 Step 7 Figure 4–5. Create User Window—Comment Tab Step 8 Step 9 Modifying CPX Users Step 1 Figure 4–6. Update User Informations Window September 2002 Administration and User Management Comments CPX User Administration...
  • Page 58 Administration and User Management Step 2 Step 3 Figure 4–7. Modify User Window Step 4 Step 5 Modify Expiration Date 1000-A2-GB21-00 September 2002...
  • Page 59: Deleting Cpx User

    1000-A2-GB21-00 Deleting CPX User Step 1 Step 2 Step 3 Reviewing CPX Users User Administration September 2002 Administration and User Management Delete...
  • Page 60 Administration and User Management 1000-A2-GB21-00 September 2002...
  • Page 61: Cpx-1000 Configuration

    CPX-1000 Configuration September 2002...
  • Page 62: Configuration Profile

    CPX-1000 Configuration CPX-1000 Configuration Profile Table 5–1. CPX-1000 Configurable Parameters CPX Parameter Description 1000-A2-GB21-00 September 2002...
  • Page 63 1000-A2-GB21-00 Table 5–1. CPX-1000 Configurable Parameters (Continued) CPX Parameter Description Modifying CPX-1000 Parameters Step 1 Step 2 September 2002 Configure CPX-1000 Configuration Configure...
  • Page 64 CPX-1000 Configuration Figure 5–1. CPX Configuration Window Step 3 Step 4 Name Warning 1000-A2-GB21-00 Country September 2002...
  • Page 65: Modifying Ip Configuration

    1000-A2-GB21-00 Step 5 Step 6 Reviewing CPX-1000 Parameters Step 1 Step 2 Modifying IP Configuration Step 1 Step 2 September 2002 Re-login Configure IP Configuration CPX-1000 Configuration Configure...
  • Page 66 CPX-1000 Configuration Figure 5–2. CPX IP Configuration Window Step 3 Step 4 Warning 1000-A2-GB21-00 September 2002...
  • Page 67: Configuring Global Vci Settings

    1000-A2-GB21-00 Step 5 Configuring Global VCI Settings Step 1 Figure 5–3. Global System Setting Window September 2002 Warning Changing the VCI value requires rebooting the CPX-1000. Rebooting the CPX-1000 drops all calls. Configure Global System CPX-1000 Configuration...
  • Page 68 CPX-1000 Configuration Step 2 Step 3 Step 4 Step 5 Re-login 1000-A2-GB21-00 September 2002...
  • Page 69: Setting Cdv Value

    1000-A2-GB21-00 Setting CDV Value Step 1 Step 2 Step 3 Step 4 Figure 5–4. CPX Configuration Window Step 5 Step 6 September 2002 Configure CPX-1000 Configuration...
  • Page 70 CPX-1000 Configuration Configuring CRC4 Setting Step 1 Step 2 Step 3 Figure 5–5. E1 Port Configuration Window Step 4 Step 5 5-10 Configure 1000-A2-GB21-00 Configure September 2002...
  • Page 71: Setting Clock Source

    1000-A2-GB21-00 CPX-1000 Configuration Setting Clock Source Step 1 Clock Synch Clock Synch Figure 5–6. Clock Synch Window September 2002 5-11...
  • Page 72 CPX-1000 Configuration Step 2 Step 3 Figure 5–7. Clock Synch Window with Clocks Unassigned Step 4 5-12 1000-A2-GB21-00 September 2002...
  • Page 73 1000-A2-GB21-00 Step 5 Figure 5–8. Clock Synch Window with Clocks Assigned Step 6 Step 7 Refreshing the CPX-1000 Display Refreshing...Done September 2002 Refresh CPX CPX-1000 Configuration 5-13...
  • Page 74 CPX-1000 Configuration 1000-A2-GB21-00 5-14 September 2002...
  • Page 75 Interface Groups Provisioning September 2002...
  • Page 76 Interface Groups Provisioning Table 6–1. Interface Group Configuration Parameters Summary Parameters Description 1000-A2-GB21-00 September 2002...
  • Page 77 1000-A2-GB21-00 Setting Up V5 Display Step 1 Step 2 Figure 6–1. V5 Display Type Window Step 3 Creating V5.1 Interface Groups Step 1 Figure 6–2. Interface Group Tabular View September 2002 V5 Display Configuration Interface Groups Provisioning...
  • Page 78 Interface Groups Provisioning Step 2 Figure 6–3. V5 Configuration Interface Group Panel Step 3 Create V5.1 IG 1000-A2-GB21-00 Create V5.1 IG Name September 2002...
  • Page 79 1000-A2-GB21-00 Step 4 Step 5 Figure 6–4. V5 Configuration Interface Group–E1 Link Assignment Panel Step 6 September 2002 E1 Link Assignment Link # Interface Groups Provisioning...
  • Page 80 Interface Groups Provisioning Step 7 Step 8 Figure 6–5. V5 Configuration Interface Group–Data Link Panel Step 9 Step 10 Data Link 1000-A2-GB21-00 Link ID September 2002...
  • Page 81 1000-A2-GB21-00 Step 11 Figure 6–6. Interface Group Tabular View with IGs Displayed Creating V5.2 Interface Groups Step 1 Figure 6–7. Interface Group Tabular View Step 2 September 2002 Refresh CPX Create V5.2 IG Interface Groups Provisioning Create V5.2 IG...
  • Page 82 Interface Groups Provisioning Figure 6–8. V5 Configuration Interface Group Panel Step 3 Step 4 1000-A2-GB21-00 Name September 2002...
  • Page 83 1000-A2-GB21-00 Step 5 Figure 6–9. V5 Configuration Interface Group–E1 Link Assignment Panel Step 6 Step 7 September 2002 E1 Link Assignment Link # Shift Ctrl Shift Ctrl Interface Groups Provisioning Link ID...
  • Page 84 Interface Groups Provisioning Step 8 Figure 6–10. V5 Configuration Interface Group– Protection Group Panel Step 9 Step 10 Step 11 Step 12 6-10 Protection Group 1000-A2-GB21-00 September 2002...
  • Page 85 1000-A2-GB21-00 Step 13 Step 14 Step 15 Figure 6–11. V5 Configuration Interface Group–Data Link Panel September 2002 Data Link Click here to bring up the drop-down list Interface Groups Provisioning 6-11...
  • Page 86 Interface Groups Provisioning Step 16 Step 17 Step 18 Figure 6–12. Interface Group Tabular View with IGs Displayed 6-12 PSTN-C Channel Type Refresh CPX 1000-A2-GB21-00 September 2002...
  • Page 87 1000-A2-GB21-00 Deleting Interface Groups Step 1 Figure 6–13. Tabular View with Interface Groups Displayed Step 2 Delete IG Delete IG Step 3 Step 4 September 2002 Delete IG Refresh CPX Interface Groups Provisioning 6-13...
  • Page 88 Interface Groups Provisioning Restarting PSTN Step 1 Figure 6–14. Variant Tabular View Step 2 Restart Reprovisioning D.WLYH 6-14 PSTN Restart 1000-A2-GB21-00 PSTN VWDQGE\ September 2002...
  • Page 89 1000-A2-GB21-00 Adding Variants Step 1 Figure 6–15. Variant Tabular View Step 2 Variant September 2002 Create Variant Interface Groups Provisioning Create 6-15...
  • Page 90 Interface Groups Provisioning Figure 6–16. Create Variant Window Step 3 Step 4 6-16 1000-A2-GB21-00 Variant September 2002...
  • Page 91 1000-A2-GB21-00 Figure 6–17. Create Variant Window—E1 Link Assignment Panel Step 5 September 2002 Shift Ctrl Shift Ctrl Interface Groups Provisioning 6-17...
  • Page 92 Interface Groups Provisioning Step 6 Step 7 Figure 6–18. Create Variant Window—Protection Group Panel Step 8 Step 9 Step 10 Step 11 6-18 Protection Group 1000-A2-GB21-00 Link ID September 2002...
  • Page 93 1000-A2-GB21-00 Step 12 Step 13 Step 14 Modifying Active Variant Step 1 Modify Variant Figure 6–19. Modify Variant Window September 2002 Refresh CPX Interface Groups Provisioning 6-19...
  • Page 94 Interface Groups Provisioning Step 2 Step 3 Step 4 Verifying a Variant Step 1 Figure 6–20. Variant Tabular View Step 2 Variant 6-20 Refresh CPX Verify Variant 1000-A2-GB21-00 Verify The result displays here September 2002...
  • Page 95 1000-A2-GB21-00 Step 3 Step 4 Deleting a Variant Step 1 Figure 6–21. Variant Tabular View Step 2 Delete Variant Step 3 Step 4 September 2002 Delete Variant Refresh CPX Interface Groups Provisioning 6-21...
  • Page 96 Interface Groups Provisioning Switching Variants Step 1 Figure 6–22. Variant Tabular View Step 2 Variant Switch Variant Step 3 Step 4 6-22 Voice/Data Interruption Active calls are dropped over a variant switching. Refresh CPX 1000-A2-GB21-00 Switch September 2002...
  • Page 97 1000-A2-GB21-00 Adding E1 Links Step 1 Figure 6–23. V5 Configuration Interface Group Panel September 2002 Modify IG Modify IG Modify Variant Interface Groups Provisioning 6-23...
  • Page 98 Interface Groups Provisioning Figure 6–24. Modify Variant Window Step 2 Figure 6–25. V5 Configuration Interface Group–E1 Link Assignment Panel 6-24 E1 Link Assignment 1000-A2-GB21-00 September 2002...
  • Page 99 1000-A2-GB21-00 Step 3 Step 4 Step 5 Step 6 Removing E1 Links Step 1 Step 2 September 2002 Link # Shift Ctrl Shift Ctrl Refresh CPX Modify IG Modify IG Interface Groups Provisioning Link ID 6-25...
  • Page 100 Interface Groups Provisioning Step 3 Figure 6–26. V5 Configuration Interface Group–E1 Link Assignment Panel Step 4 Step 5 Step 6 6-26 Modify Variant E1 Link Assignment Card/Port Shift Ctrl Shift Ctrl Refresh CPX 1000-A2-GB21-00 September 2002...
  • Page 101 1000-A2-GB21-00 Performing E1 Link ID Check Step 1 Figure 6–27. Variant Tabular View Step 2 Step 3 Check Changing E1 Link States September 2002 Interface Groups Provisioning E1 Link ID 6-27...
  • Page 102 Interface Groups Provisioning Table 6–2. E1 Link States Current State Unblock Step 1 Figure 6–28. Variant Tabular View Step 2 Step 3 Figure 6–29. E1 Link Configuration Window 6-28 Deferred Block Block Not Deferred Switch Variant 1000-A2-GB21-00 Forced Block September 2002...
  • Page 103 1000-A2-GB21-00 Step 4 Step 5 September 2002 Interface Groups Provisioning 6-29...
  • Page 104 Interface Groups Provisioning Viewing E1 Link Status Step 1 Step 2 Figure 6–30. Variant Tabular View Step 3 Status. 6-30 1000-A2-GB21-00 E1 Link September 2002...
  • Page 105 1000-A2-GB21-00 Interface Groups Provisioning Figure 6–31. E1 Link Status September 2002 6-31...
  • Page 106 Interface Groups Provisioning 1000-A2-GB21-00 6-32 September 2002...
  • Page 107 Protection Group Provisioning Table 7–1. Protection Group Summary Fields Description VORWBQXPEHUSRUWBQXPEHU September 2002...
  • Page 108 Protection Group Provisioning Assigning Protection Group Members Step 1 Figure 7–1. Network Protection Group Tabular View Step 2 Step 3 Network PG Configure 1000-A2-GB21-00 Configure September 2002...
  • Page 109 1000-A2-GB21-00 Figure 7–2. Configuration for Network PG Window Step 4 Slot/Port Step 5 Step 6 Step 7 Step 8 Step 9 Figure 7–3. Protection Groups Displayed in Tabular View September 2002 Unlocked Y-cable Straight Refresh CPX Protection Group Provisioning...
  • Page 110: Swapping Protection Group Members

    Protection Group Provisioning Swapping Protection Group Members Step 1 Figure 7–4. Protection Groups Displayed in Tabular View Step 2 Step 3 Step 4 Step 5 Network PG PG Swap Refresh CPX 1000-A2-GB21-00 PG Swap September 2002...
  • Page 111: Removing Protection Group Members

    1000-A2-GB21-00 Removing Protection Group Members Step 1 Figure 7–5. Protection Groups Displayed in Tabular View Step 2 Step 3 Figure 7–6. Configuration for Network PG Window September 2002 Network PG Configure Protection Group Provisioning Configure...
  • Page 112 Protection Group Provisioning Step 4 Step 5 Step 6 Step 7 Step 8 Unassigned Slot/Port Locked unassigned Port Primary Member unassigned Refresh CPX 1000-A2-GB21-00 Slot/ September 2002...
  • Page 113 IAD Profiles and ISDN Port Templates Provisioning September 2002...
  • Page 114: Adding Iad Profiles

    IAD Profiles and ISDN Port Templates Provisioning Adding IAD Profiles Step 1 Profile Figure 8–1. Add IAD Profile Window Step 2 Profile Name 1000-A2-GB21-00 Create IAD Profile Create IAD September 2002...
  • Page 115: Modifying Iad Profiles

    1000-A2-GB21-00 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Modifying IAD Profiles Step 1 September 2002 IAD Profiles and ISDN Port Templates Provisioning IAD Profile Manager...
  • Page 116 IAD Profiles and ISDN Port Templates Provisioning Figure 8–2. Update IAD Profile Window Step 2 Figure 8–3. Modify IAD Profile Window 1000-A2-GB21-00 Modify September 2002...
  • Page 117: Deleting Iad Profiles

    1000-A2-GB21-00 Step 3 Step 4 Deleting IAD Profiles Step 1 Figure 8–4. Update IAD Profile Window Step 2 Step 3 Step 4 September 2002 IAD Profiles and ISDN Port Templates Provisioning Delete IAD Profile Manager...
  • Page 118 IAD Profiles and ISDN Port Templates Provisioning ISDN Port Templates Summary Table 8–1. ISDN Configurable Parameters Summary Parameter Description 1000-A2-GB21-00 September 2002...
  • Page 119 1000-A2-GB21-00 Creating ISDN Port Template Step 1 Template Figure 8–5. ISDN Port Template Creation Window Step 2 Name Step 3 Description September 2002 IAD Profiles and ISDN Port Templates Provisioning Create ISDN Port Template Template...
  • Page 120 IAD Profiles and ISDN Port Templates Provisioning Step 4 Step 5 Step 6 Step 7 Step 8 Logical Channel ID 1000-A2-GB21-00 Link Number Time Slot September 2002...
  • Page 121 1000-A2-GB21-00 Modifying ISDN Port Template Step 1 Manager Figure 8–6. ISDN Port Template Manager Window September 2002 IAD Profiles and ISDN Port Templates Provisioning ISDN Port Template...
  • Page 122 IAD Profiles and ISDN Port Templates Provisioning Step 2 Modify Figure 8–7. ISDN Port Template Modification Window Step 3 Step 4 8-10 1000-A2-GB21-00 September 2002...
  • Page 123 1000-A2-GB21-00 Deleting ISDN Port Template Step 1 Manager Figure 8–8. ISDN Port Template Manager Window Step 2 Delete Step 3 Step 4 September 2002 IAD Profiles and ISDN Port Templates Provisioning Close ISDN Port Template 8-11...
  • Page 124 IAD Profiles and ISDN Port Templates Provisioning 1000-A2-GB21-00 8-12 September 2002...
  • Page 125 IADs - ID - Serial No. - Interface Group - State Figure 9–1. IAD Installation September 2002 IADs Provisioning Directory Number per Port Phone I AD DSLAM Phone I AD - DSLAM Name - ILEC Company CPX- 1000 ATM Transport Switch Permanent Virtual Circuit (PVC) per IAD...
  • Page 126: Iad Admin States

    IADs Provisioning Enabled IAD Admin States Provisional Enabled Unlocked Unlocked 1000-A2-GB21-00 Disabled Disabled September 2002...
  • Page 127 1000-A2-GB21-00 Table 9–1. Modifiable Options in Different Administrative States At IAD Level Tasks/ Profile Service Admin State Name Affecting September 2002 At Port Level IAD Port # of Admin Signaling Ports State IADs Provisioning Echo Compression...
  • Page 128: Creating Iads

    IADs Provisioning Creating IADs withV5.2 IG Step 1 Figure 9–2. IAD Creation Wizard–Introduction Screen Create IAD 1000-A2-GB21-00 Create September 2002...
  • Page 129 1000-A2-GB21-00 Step 2 Figure 9–3. IAD Creation Wizard–Informational Screen Step 3 Figure 9–4. IAD Creation Wizard–IAD Selection Screen September 2002 Next Next Next IADs Provisioning...
  • Page 130 IADs Provisioning Step 4 Step 5 Figure 9–5. IAD Creation Wizard–IG Selection Screen Step 6 Step 7 Figure 9–6. IAD Creation Wizard–ATM PG Configuration Screen IAD Type Next Interface Group ID Interface Group version Next 1000-A2-GB21-00 IAD Profile September 2002...
  • Page 131 1000-A2-GB21-00 Step 8 Protection Group Step 9 Step 10 Step 11 Step 12 Figure 9–7. IAD Creation Wizard–Reference Configuration Screen September 2002 Frame Relay Next IADs Provisioning...
  • Page 132 IADs Provisioning Step 13 Step 14 Figure 9–8. IAD Creation Wizard–Port Configuration Screen Step 15 Address Next 1000-A2-GB21-00 Starting September 2002...
  • Page 133 1000-A2-GB21-00 Step 16 Step 17 Figure 9–9. IAD Creation Wizard–D Channel Assignment Screen Step 18 September 2002 Next ISDN Port Template IADs Provisioning Available...
  • Page 134 IADs Provisioning Step 19 Step 20 Step 21 Figure 9–10. IAD Creation Wizard–D Channel Assignment Screen Step 22 9-10 Channel Type Timeslot Next 1000-A2-GB21-00 Create IAD. Back September 2002...
  • Page 135 1000-A2-GB21-00 Creating IADs with V5.1 IG Step 1 Figure 9–11. IAD Creation Wizard–Introduction Screen September 2002 Create IAD IADs Provisioning Create 9-11...
  • Page 136 IADs Provisioning Step 2 Figure 9–12. IAD Creation Wizard–Informational Screen Step 3 Figure 9–13. IAD Creation Wizard–IAD Profile Selection Window 9-12 Next Next Next 1000-A2-GB21-00 September 2002...
  • Page 137 1000-A2-GB21-00 Step 4 Step 5 Figure 9–14. IAD Creation Wizard–IG Selection Window Step 6 Step 7 Figure 9–15. IAD Creation Wizard–ATM Protection Group Configuration Window September 2002 IAD Type Next Interface Group Name Interface Group version Next IADs Provisioning IAD Profile 9-13...
  • Page 138 IADs Provisioning Step 8 Protection Group Step 9 Step 10 Step 11 Step 12 Step 13 Figure 9–16. IAD Creation Wizard–Reference Configuration Screen 9-14 Frame Relay Next 1000-A2-GB21-00 September 2002...
  • Page 139 1000-A2-GB21-00 Step 14 Step 15 Figure 9–17. IAD Creation Wizard–Port Configuration Window Step 16 September 2002 Next Starting Address IADs Provisioning 9-15...
  • Page 140 IADs Provisioning Step 17 Step 18 B Channel assignment for ISDN configuration B Channel assignment for POTS configuration Figure 9–18. IAD Creation Wizard–B Channel Assignment Screen 9-16 Next 1000-A2-GB21-00 September 2002...
  • Page 141 1000-A2-GB21-00 Step 19 Step 20 Figure 9–19. IAD Creation Wizard–D Channel Assignment Screen Step 21 Step 22 September 2002 Next ISDN Port Template IADs Provisioning Available 9-17...
  • Page 142 IADs Provisioning Step 23 Figure 9–20. IAD Creation Wizard–IAD Creation Summary Screen Step 24 Modifying IADs Step 1 Manager 9-18 Next IAD Manager 1000-A2-GB21-00 Create IAD. Back September 2002...
  • Page 143 1000-A2-GB21-00 Figure 9–21. IAD Configuration Manager Window Step 2 Number of IADs retrieved Figure 9–22. IAD Configuration Manager Window with IADs Displayed September 2002 Click here to display IADs Show IADs IADs Provisioning 9-19...
  • Page 144 IADs Provisioning Step 3 Step 4 Figure 9–23. IAD Modification Window 9-20 Modify 1000-A2-GB21-00 Lock September 2002...
  • Page 145: Deleting Iads

    1000-A2-GB21-00 Step 5 Step 6 Step 7 Step 8 Deleting IADs Step 1 Manager Figure 9–24. IAD Configuration Manager Window September 2002 Close Refresh CPX IAD Manager Click here to display IADs IADs Provisioning 9-21...
  • Page 146 IADs Provisioning Step 2 Number of IADs retrieved Figure 9–25. IAD Configuration Manager Window with IADs Displayed Step 3 Step 4 Figure 9–26. Delete IAD Window 9-22 Show IADs Ctrl Delete 1000-A2-GB21-00 Lock Shift Ctrl Shift September 2002...
  • Page 147: Searching Iads By Fields

    1000-A2-GB21-00 Step 5 Step 6 Step 7 Reviewing IADs Searching IADs by Fields Step 1 Manager September 2002 Yes To All No To All Close Refresh CPX IAD Manager IADs Provisioning IAD Manager 9-23...
  • Page 148 IADs Provisioning Click one or both checkboxes to filter IADs Figure 9–27. View/Update IAD Window Step 2 Searching by Company, DSLAM, and Subscriber Step 1 Step 2 Searching by the Network Protective Groups Step 1 Step 2 Step 3 9-24 Company Network Protection Group 1000-A2-GB21-00...
  • Page 149 1000-A2-GB21-00 Step 4 Step 5 Searching by the Interface Groups Step 1 Step 2 Step 3 Step 4 Step 5 Searching by the Hardware Model Step 1 Step 2 Step 3 Searching by Directory Step 1 Step 2 Step 3 September 2002 Interface Group HW Model...
  • Page 150 IADs Provisioning 1000-A2-GB21-00 9-26 September 2002...
  • Page 151: Alarms Notification

    Alarms Notification Figure 10–1. Alarm Window September 2002 Alarms, Events, and Statistics 10-1...
  • Page 152 Alarms, Events, and Statistics Figure 10–2. Alarmed Element in the Tree View Table 10–1. Alarm Severity by Color 10-2 Colored X indicating alarms Alarm Severity Color 1000-A2-GB21-00 September 2002...
  • Page 153: Cpx Alarms

    1000-A2-GB21-00 CPX Alarms Setting Alarm Polling Interval Step 1 Figure 10–3. Alarm Polling Interval Configuration Step 2 Step 3 September 2002 Alarm Polling Interval Alarms, Events, and Statistics 10-3...
  • Page 154 Alarms, Events, and Statistics Statistics 10-4 1000-A2-GB21-00 Show Reset September 2002...
  • Page 155 1000-A2-GB21-00 Figure 10–4. Absolute and Relative Values September 2002 Click Show to mark the initial absolute value Absolute Relative Alarms, Events, and Statistics Click Reset to display the relative value 10-5...
  • Page 156: Statistics Summary

    Alarms, Events, and Statistics 1000-A2-GB21-00 Statistics Summary Table 10–2. Summary of Error and Performance Statistics Selected Element Error Statistics Available Performance Statistics Available 10-6 September 2002...
  • Page 157 1000-A2-GB21-00 Alarms, Events, and Statistics Table 10–2. Summary of Error and Performance Statistics (Continued) Selected Element Error Statistics Available Performance Statistics Available September 2002 10-7...
  • Page 158 Alarms, Events, and Statistics 1000-A2-GB21-00 Table 10–2. Summary of Error and Performance Statistics (Continued) Selected Element Error Statistics Available Performance Statistics Available 10-8 September 2002...
  • Page 159: Accessing Network Protection Groups

    1000-A2-GB21-00 Accessing Network Protection Groups Step 1 Figure 10–5. Network Protection Group Tabular View Step 2 Step 3 Step 4 September 2002 Network PG Performance Graphs Alarms, Events, and Statistics 10-9...
  • Page 160: Accessing Iads

    Alarms, Events, and Statistics Accessing IADs Step 1 Manager Step 2 Figure 10–6. IAD Configuration Manager Window with IAD Displayed Step 3 Step 4 Step 5 10-10 IAD Manager Show IADs Errors Performance 1000-A2-GB21-00 September 2002...
  • Page 161 1000-A2-GB21-00 Accessing E1 Links Step 1 Figure 10–7. Variant Tabular View Step 2 Step 3 Step 4 September 2002 Error Graphs Performance Graphs Performance Graphs Alarms, Events, and Statistics Errors Graphs 10-11...
  • Page 162: Graphing Statistics

    Alarms, Events, and Statistics Graphing Statistics Step 1 Step 2 Figure 10–8. Graphing Window Step 3 Properties Step 4 Step 5 10-12 Graph format selections SORW On Line 1000-A2-GB21-00 Select September 2002...
  • Page 163 1000-A2-GB21-00 Step 6 Step 7 Step 8 Figure 10–9. Sample Graph Window September 2002 *UDSK 7DEOH Show Show Close Alarms, Events, and Statistics Reset 10-13...
  • Page 164 Alarms, Events, and Statistics 1000-A2-GB21-00 Figure 10–10. Sample Table Window 10-14 September 2002...
  • Page 165 CPX-1000 Maintenance and Services September 2002 11-1...
  • Page 166 CPX-1000 Maintenance and Services Backing Up CPX-1000 Database Step 1 Figure 11–1. Backup CPX Configuration Window Step 2 Step 3 11-2 Backup CPX Configuration c:\> ftp <cpx IP address> Login: anonymous Password: <your password> ftp> bin (change to binary mode) ftp>...
  • Page 167 Step 2 Figure 11–2. Reboot CPX Configuration Window Step 3 September 2002 Warning Restoring a CPX-1000 configuration requires rebooting both the MP and CP cards. Rebooting the CP card interrupts service. c:\> ftp <cpx IP address> Login: anonymous Password: <your password>...
  • Page 168 CPX-1000 Maintenance and Services Step 4 Step 5 Step 6 Rebooting the CPX-1000 Step 1 Step 2 Step 3 Step 4 11-4 Voice/Data Interruption When rebooting the CPX-1000, all cards power down gracefully. Calls are dropped immediately. Reboot Re-login 1000-A2-GB21-00 September 2002...
  • Page 169: Rebooting The Mp Or Cp Card

    1000-A2-GB21-00 Rebooting the MP or CP Card Step 1 Step 2 Step 3 Setting the Clock Step 1 Step 2 September 2002 Warning Rebooting the CP card interrupts service. Reboot Time Configuration Time Configuration CPX-1000 Maintenance and Services 11-5...
  • Page 170 CPX-1000 Maintenance and Services Figure 11–3. Set CPX Time Window Step 3 Figure 11–4. Day Calendar Step 4 Step 5 Step 6 Step 7 11-6 Select 1000-A2-GB21-00 September 2002...
  • Page 171: Switching Cp Cards

    1000-A2-GB21-00 Switching CP Cards September 2002 States CP-A States CP-B CPX-1000 Maintenance and Services CP-B CP-A 11-7...
  • Page 172: Ensuring Redundancy

    CPX-1000 Maintenance and Services Ensuring Redundancy ,QWURGX.WLRQ DQG 7H.KQL.DO 'HV.ULSWLRQ Indicates out-of-service administrative state Figure 11–5. Shelf View 11-8 Primary CP card in slot 7 1000-A2-GB21-00 &3; Secondary CP card in slot 9 September 2002...
  • Page 173: Changing Cp Card States

    1000-A2-GB21-00 Changing CP Card States Step 1 Configure Figure 11–6. CP Card Configuration Window September 2002 CPX-1000 Maintenance and Services Configure 11-9...
  • Page 174 CPX-1000 Maintenance and Services Step 2 Figure 11–7. CP Card Configuration—Status Tab Step 3 Step 4 Step 5 11-10 Status 1000-A2-GB21-00 September 2002...
  • Page 175: Performing A Cp Switchover

    1000-A2-GB21-00 Performing a CP Switchover Step 1 Step 2 Step 3 Step 4 Hot Swapping September 2002 Voice/Data Interruption Calls being set up during a CP switchover are dropped. Switchover &3; 9RL.H 6HUYL.HV 3ODWIRUP 6HUYL.H CPX-1000 Maintenance and Services 11-11...
  • Page 176: Hot Swapping Mp Card

    CPX-1000 Maintenance and Services Hot Swapping MP Card Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 11-12 Remove Resources Refresh CPX 1000-A2-GB21-00 September 2002...
  • Page 177 Hot Swapping CP and HSC Cards Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 September 2002 &3; 9RL.H 6HUYL.HV 3ODWIRUP 6HUYL.H Remove Resources Refresh CPX CPX-1000 Maintenance and Services 11-13...
  • Page 178: Hot Swapping Line Cards

    CPX-1000 Maintenance and Services Hot Swapping Line Cards Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 11-14 &3; 9RL.H 6HUYL.HV 3ODWIRUP 6HUYL.H Remove Resources Refresh CPX 1000-A2-GB21-00 September 2002...
  • Page 179: Downloading Iad Software

    Downloading IAD Software Step 1 Manager Step 2 September 2002 IAD Status and IAD Manager Show IADs Maintenance 12-1...
  • Page 180 IAD Status and Maintenance Figure 12–1. IAD Configuration Manager Window with IADs Displayed Step 3 12-2 Download 1000-A2-GB21-00 September 2002...
  • Page 181 1000-A2-GB21-00 Figure 12–2. IAD Software Download dialog Step 4 Step 5 Step 6 Step 7 September 2002 Restart IAD after download completes Delay restart of IAD until no active calls Download Status IAD Status and Maintenance Available Versions 12-3...
  • Page 182 IAD Status and Maintenance Remote Restarting of IADs Step 1 Step 2 Step 3 Manager Figure 12–3. IAD Configuration Manager Window 12-4 IAD Manager Click here to display IADs 1000-A2-GB21-00 September 2002...
  • Page 183 1000-A2-GB21-00 Step 4 Figure 12–4. IAD Configuration Manager Window with IADs Shown Step 5 Step 6 Figure 12–5. Restart IAD Dialog Box September 2002 Show IADs Ctrl IAD Status and Maintenance Shift Ctrl Shift 12-5...
  • Page 184 IAD Status and Maintenance Step 7 Step 8 Figure 12–6. IAD Restart Status Pop-up Window Monitoring IAD Port Status Step 1 Step 2 Manager 12-6 Delay restart until no active calls IAD Restart Status IAD Manager 1000-A2-GB21-00 September 2002...
  • Page 185 1000-A2-GB21-00 IAD Status and Maintenance Click here to display IADs Figure 12–7. IAD Configuration Manager Window September 2002 12-7...
  • Page 186 IAD Status and Maintenance Step 3 Number of IADs retrieved Figure 12–8. IAD Configuration Manager Window with IADs Displayed 12-8 Show IADs 1000-A2-GB21-00 September 2002...
  • Page 187 1000-A2-GB21-00 Step 4 Figure 12–9. IAD Modification Window Step 5 September 2002 Modify IAD Status and Maintenance 12-9...
  • Page 188 IAD Status and Maintenance 1000-A2-GB21-00 Figure 12–10. IAD Modification Port Status Window 12-10 September 2002...
  • Page 189 JetCraft Menu Map September 2002...
  • Page 190 JetCraft Menu Map File Configuration Menu Refresh CPX Exit Figure A–1. JetCraft Menu Map Log On (User ID/Password) Main Menu Services Menu Menu Confiugre Backup CPX Configuration Switchover Restore CPX Create V5.2 IG Configuration Create V5.1 IG Alarm Polling Interval Configuration Modify IG V5 Display Delete IG...
  • Page 191 Table B–1. Error Statistics Definitions Error Statistics CPX Statistics ATM DS-3 September 2002 Statistics Definitions Description...
  • Page 192 Statistics Definitions Table B–1. Error Statistics Definitions (Continued) Error Statistics ATM STM-1 IAD Subscribers Statistics E1 link Statistics Description 1000-A2-GB21-00 September 2002...
  • Page 193 1000-A2-GB21-00 Statistics Definitions Table B–1. Error Statistics Definitions (Continued) Error Statistics Description September 2002...
  • Page 194 Statistics Definitions Table B–2. Performance Statistics Definitions Performance Statistics CPX Statistics MP Card Description 1000-A2-GB21-00 September 2002...
  • Page 195 1000-A2-GB21-00 Table B–2. Performance Statistics Definitions (Continued) Performance Statistics Protection Group STM-1 Port Statistics IADs Statistics E1 link Statistics September 2002 Description Statistics Definitions...
  • Page 196 Statistics Definitions 1000-A2-GB21-00 September 2002...
  • Page 197: Alarm Summary

    Table C–1. Alarm Summary Affected Alarm Message Element September 2002 Alarm Summary Description Triggered Severity...
  • Page 198 Alarm Summary Table C–1. Alarm Summary (Continued) Affected Alarm Message Element Description 1000-A2-GB21-00 Triggered Severity September 2002...
  • Page 199 1000-A2-GB21-00 Table C–1. Alarm Summary (Continued) Affected Alarm Message Element September 2002 Description Alarm Summary Triggered Severity...
  • Page 200 Alarm Summary Table C–1. Alarm Summary (Continued) Affected Alarm Message Element Description PSTN LapV5 session failed. link control LapV5 session failed protection LapV5 session failed. BCC LapV5 session failed Indicates V5 Interface startup failed. 1000-A2-GB21-00 Triggered Severity September 2002...
  • Page 201 Symbols 6-14 6-2, 6-28 11-10 11-9 10-1 10-2 10-1 10-1 10-3 September 2002 10-3 9-7, 9-14 9-24, 9-25 9-24, 9-25 11-5 6-29 6-29 DOVR &'9 11-9 Index 10-7 10-6 10-9 11-2 6-29 9-23 11-6 6HH'HIDXOW 3DUDJUDSK )RQW! 5-10 6-28, 6-30 4-2, 4-3...
  • Page 202 Index 6-20 11-5 5-11 10-10 2-10 5-3, 5-4 11-9 11-13 11-8 11-5 11-8 11-8 11-8 11-11 11-2 11-5 5-2, 5-5 10-6 11-5 11-4 11-8 5-13 11-3 5-10 9-4, 9-11 6-15 9-25 2-8, 4-1 9-21 10-6 6-21 1000-A2-GB21-00 11-3 5-1, 5-5 11-2 10-2 9-23...
  • Page 203 1000-A2-GB21-00 6-30 6-23 10-8 6-25 10-11 6-27 6-2, 6-28 6-29 6-29 6-29 6-28, 6-30 10-6 10-6 11-2, 11-3 9-23 11-11 9-7, 9-14 11-2, 11-3 10-12 11-13 11-13 11-14 11-12 September 2002 11-13 9-4, 9-11 10-8 9-21 Index 11-8 9-23 9-23 9-23 10-7 9-23...
  • Page 204 Index 6-19 6-13 9-24, 9-25 6-13 9-24, 9-25 11-5 8-11 8-11 2-10 2-11 2-10 2-10 11-14 1000-A2-GB21-00 10-2 10-2 9-20, 12-9 6-19 9-18 6-19 6-19 12-6 11-12 11-5 11-8 6-9, 6-17, 6-25, 6-26 6-2, 6-28 4-2, 4-3 10-6 10-6 10-6 September 2002...
  • Page 205 1000-A2-GB21-00 6-9, 6-17, 6-25, 6-26 6-10 6-10 6-10 10-6 9-24, 9-25 9-24, 9-25 10-9 6-14 11-5 11-4 11-5 11-8 5-13 2-10 12-4 2-11 6-13 8-11 2-11 2-11 11-3 September 2002 9-23 6-10 5-11 5-10 6-10 6-10 11-8 11-8 11-8 10-3 6-14 10-6 10-12...
  • Page 206 Index 2-11 11-5 2-8, 4-1 6-14 9-11 6-1, 6-10 6-1, 6-10 1000-A2-GB21-00 6-14 6-20 6-15 6-21 6-19 6-15 6-14 6-22 6-20 5-7, 9-25 2-11 10-3 6-30 9-7, 9-14 September 2002...

This manual is also suitable for:

Jetstream jetcraft 3.2

Table of Contents