3.14 PV Test
Performance Verification Test of JUE-87 can be carried out with following below outlined procedures.
Carry out PV test with confirming that JUE-87 is logged-in.
Step
Operation
•
1
Hold down
Alt
press
key on Main
U
menu.
•
2
Move the cursor to the
item "Performance
test initiation" and
press
key.
Enter
•
3
Move the cursor to
"Yes" and press
key.
4
IME/DTE Response
•
key and
The "Set up" window is
displayed.
•
Initiation confirming window
is displayed.
•
"Performance test" window
is displayed.
Do you initiate performance test ? YES NO
•
The "Set up" window is displayed.
MES status changes to "PV test" from "Ready".
Enter
•
The following window is displayed within PV testing.
Automatic test mode:
Normal communication disabled.
Do not press any distress button
unless you are in distress.
•
When PV test is completed, test
results are displayed
automatically.
3-103
Performance test
•
Remarks
3
See the following
example of test
results.