Operation; Connections - ESAB powercut 700 PT-39 Instruction Manual

Hide thumbs Also See for powercut 700 PT-39:
Table of Contents

Advertisement

US
6

OPERATION

General safety regulations for the handling of the equipment can be found on
page 4. Read through before you start using the equipment!
6.1

Connections

1
Pre-filtered dry air supply
2
Power cable
3
Connection of return cable with clamp
bp23aa
4
Torch connection
4
Control panel, see chapter
- 14 -
5.2
© ESAB AB 2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents