Selection
Illustration 3.6 Relay Option Kit
WARNING
Warning Dual supply.
How to add the MCB 105 option:
•
See mounting instructions in the beginning of
section Options and Accessories
•
Disconnec power to the live part connections on
relay terminals.
•
Do not mix live parts with control signals (PELV).
•
Select the relay functions in 5-40 Function Relay
[6-8], 5-41 On Delay, Relay [6-8] and 5-42 Off
Delay, Relay [6-8].
NOTICE
Index [6] is relay 7, index [7] is relay 8, and index [8] is
relay 9
Relay 7
Relay 8
NC
1
2
3
4
5
6
Illustration 3.7 Relay 7, Relay 8, and Relay 9
MG11BC02
Design Guide
1
2
Relay 9
NC
NC
7
8
9
10
11
12
Danfoss A/S © Rev. 06/2014 All rights reserved.
DC-
DC+
6
5
2
Illustration 3.8 Mounting
3
3
55
Need help?
Do you have a question about the FC 102 and is the answer not in the manual?
Questions and answers