Configuring Automatic On Battery Shutdown - Eaton 9910 User Manual

Powerware series
Hide thumbs Also See for 9910:
Table of Contents

Advertisement

OPERATION
32
Eaton 9910 UPS and EBM User's Guide
To set the restart delay times for each load segment:
1.
From the main menu, press the down (
Configuration menu, and press the OK button.
B
2.
Press the down (
press the OK button.
3.
Press the down (
B
want to set and press the OK button.
4.
Press the down (
B
segment. You can specify one of the following options for the
restart delay time for each load segment:
S
Select zero seconds to restart immediately.
S
Select 1–32767 seconds to delay for the specified time.
S
Select Off.
5.
Press the OK button for 1 second to confirm.
6.
Repeat Step 3 to Step 5 to set the other load segment, if applicable.
NOTE Load segment on/off commands that are issued through the Control menu override
the user settings for load segments.
NOTE A single load segment delay applies to both receptacles. However, there is an
additional automatic 1-second delay between closing segments 1 and 2. The delay is always
present when an On command is issued for both segments at the same time.

Configuring Automatic on Battery Shutdown

You can use the Automatic on Battery Shutdown setting to configure how
soon the load segment shuts down when the UPS transfers to Battery
mode:
S
If you select Off (default), the load segment turns off only when you
manually press the button, issue an external command, or turn it off
through the display (Control > Load Segments).
S
P-164000005 Rev 2
B
) button to scroll to Automatic Start Delay, and
) button to select the load segment that you
) button to select the restart delay for the load
) button to scroll to the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents