Configuring Load Segments; Controlling Load Segments Through The Lcd; Configuring Automatic Start Delay - Eaton 9910 User Manual

Powerware series
Hide thumbs Also See for 9910:
Table of Contents

Advertisement

Configuring Load Segments

Load segments are sets of receptacles that can be controlled through
the LCD, by power-management software, or through optional
communication cards, providing an orderly shutdown and startup of the
connected devices. For example, during a power outage, you can keep
key devices running while you turn off other devices. This feature
enables you to save battery power.
Each UPS has two load segments. The figures in "UPS Rear Panels" on
page 2 show the load segments for each UPS model.

Controlling Load Segments through the LCD

To control the load segments through the LCD:
1.
From the main menu, press the down (
Control menu, and press the OK button.
2.
Press the down (
B
OK button.
3.
Press the down (
B
want and press the OK button.
4.
Press the down (
B
5.
Press the OK button for 1 second to confirm.
6.
Repeat Step 3 to Step 5 to set the other load segment, if applicable.

Configuring Automatic Start Delay

Load segments turn on automatically after the utility power returns if
they were shut down by any of the following means:
S
The on/off button
S
An external command with the auto-restart option
S
Battery under voltage state
S
Automatic on battery shutdown command
You can change the length of the restart delay time or disable automatic
restart.
Eaton 9910 UPS and EBM User's Guide
B
) button to scroll to Load Segments, and press the
) button to scroll to the load segment that you
) button to set the load segment to On or Off.
OPERATION
) button to scroll to the
S
P-164000005 Rev 2
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents