Periodic Maintenance Checklist; Pump Inspection - Teledyne 5800 Installation And Operation Manual

Refrigerated sampler isco
Hide thumbs Also See for 5800:
Table of Contents

Advertisement

Isco 5800
Refrigerated Sampler
Section 5 Maintenance
5.1 Periodic Maintenance
Checklist

5.1.1 Pump Inspection

In this section...

• Periodic Maintenance Checklist

• Sampler Diagnostics, page 5-7
• Temperature Verification, page 5-14
This section describes how to maintain and troubleshoot your
sampler. If you think your sampler requires repair, or if you have
questions concerning its operation or maintenance, contact your
authorized Isco service facility or Teledyne Isco's Technical
Service Department:
Phone: (800) 228-4373 (USA, Canada, Mexico)
(402) 464-0231 (international)
FAX:
(402) 465-3001
E-mail:IscoService@teledyne.com
Before each use:
• Inspect the pump. Service as necessary.
• Inspect the pump housing and rollers.
• Clean or replace the wetted parts (bottles, suction line,
strainer, pump tube, and discharge tube).
• Clean the sampler as necessary.
Inspect the pump before each use. Inspections are especially
important when pumping large sample volumes over long
distances or when the sample liquid contains a high percentage
of suspended or abrasive solids. Pumps in need of service might
experience performance problems such as:
• Faulty liquid detection
• Inaccurate sample volumes
• The sampler will not pump any liquid
• Pump jams.
To inspect the pump:
1. Press the On/Off button to place the sampler controller in
the Standby state. This ensures that the sampler will not
attempt to operate the pump.
5-1

Advertisement

Table of Contents
loading

Table of Contents