Installing The Aileron Linkage; Landing Gear Installation - Seagull Models Jumper 25 Assembly Manual

Hide thumbs Also See for Jumper 25:
Table of Contents

Advertisement

Jumper 25
INSTALLING THE AILERON SERVO
 6) Install the aileron servo into the servo
mount, with the output shaft towards the
lead ing edge of the wing, using the wood
screws pro vid ed with your ra dio sys tem. Drill
1/16" pi lot holes through the mount
be fore in stall ing the screws. This will pre vent
the wood from splitting.
AILERON LINKAGE
PARTS REQUIRED
q {2} 2mm x 170mm Threaded Wires
q {2} Nylon Adjustable Control Horns
q {2} Nylon Clevises
q {2} Adjustable Servo Connector Assemblies

INSTALLING THE AILERON LINKAGE

 1) Thread one nylon adjustable control
horn onto each aileron torque rod. Thread the
horns on un til they are fl ush with the ends of
the torque rods.
 2) Thread one nylon clevis at least 5/16"
onto each of the two 2mm x 170mm thread ed
wires.
 3) With the aileron servo cen tered, in stall
the servo arm onto the ser vo. The arm should
be in stalled so it is parallel with the trailing
edge of the wing.
Instruction Man u al
 5) Slide the pushrod wires following
pic ture bellow.
 6) With both the aileron servo and the
ai le rons centered.
Connector

LANDING GEAR INSTALLATION

PARTS REQUIRED
q {2} Prebent Main Gear Wires
q {2} 60mm Diameter Wheels
q {4} Nylon Landing Gear Straps
q {8} 3mm x 12mm Wood Screws
q {4} Wheel Collars w/3mm x 6mm Set
Screws
Pushrod
wire
5

Advertisement

Table of Contents
loading

Table of Contents