Installing The Fuselage Servos; Installing The Switch - Seagull Models Jumper 25 Assembly Manual

Hide thumbs Also See for Jumper 25:
Table of Contents

Advertisement

Jumper 25
Jumper 25

INSTALLING THE FUSELAGE SERVOS

PARTS REQUIRED

INSTALLING THE SWITCH

 1
Install the switch into the precut hole in
the servo tray, in the fuselage, from the bottom.
Use the two screws pro vid ed with the switch to
secure it in place. Drill two 3/32" holes through
the tray for the screws to pass through.
 2
Using a 3/32" drill bit, drill a hole
through the side of the fuselage, opposite
the muffl er, even with the switch.
 3
Make a push-pull lever out of scrap
wire. At tach the wire to the switch lever and
route the wire out the side of the fuselage,
through the hole you drilled.
Switch
Instruction Man u al
Some switches come with a hole drilled
through the switch tab for this very
pur pose. If your switch does not, re move the
switch and drill a 3/32" hole through the mid dle
of the switch tab.
INSTALLING THE FUSELAGE SERVOS
4. Install the rubber grommets and
4. Install the rubber grommets and
4. Install the rubber grommets and
brass col lets onto the elevator, rudder
and throt tle servos. Test fi t the servos into
the preinstalled servo tray.Because the size
of servos differ, you may need to adjust the
size of the precut open ings in the tray.
 5.Position the servos into the servo tray with
the output shafts orientated as shown below.
Drill 1/16" pi lot holes through the tray for each
of the mount ing screws.
11

Advertisement

Table of Contents
loading

Table of Contents