Configuring Locomotive For 2-Rail Or 3-Rail Operation; Installing/Removing Pickup Rollers; Configuring For 2-Rail Or 3-Rail Power Input - M.T.H. Premier Bavarian Class 3/6 Express Operator's Manual

Steam locomotive
Table of Contents

Advertisement

Available languages

Available languages

Configuring Locomotive for
2-Rail or 3-Rail Operation
Installing/Removing 3-Rail Pickup Rollers
Both 2-Rail and 3-Rail versions of this
locomotive can be configured to
operate on either 2-rail or 3-rail track
by removing or adding the center rail
pickups. 3-rail track operation requires
the pickups,
2-rail track operation does not.
The pickups are factory installed on
3-rail versions and packaged separately
in the locomotive box for 2-rail
versions. Each pickup roller installs
with a single Phillips screw seen in
Figure 1.
Figure 2: 3-Rail Pickups installed with a single Phillips Screw

Configuring for 2-Rail or 3-Rail Power Input

Once you have configured the
engine for 2-rail or 3-rail
operation, you must manually
select the power input switch
located in the tender as seen in
Figure 3.
Premier Bavarian Class 3/6 Express Steam Locomotive
Phillips Screw
Figure 3: Selecting 2-rail or 3-rail power input setting
3
Phillips Screw
Figure 1
2-Rail/3-Rail Switch

Advertisement

Chapters

Table of Contents
loading

Table of Contents