Differential Carrier Assembly: Removal & Installation (4.2L Engine); Upper Ball Pinch Nut And Bolt Removal And Installation - Chevrolet Trailblazer Service Manual

Hide thumbs Also See for Trailblazer:
Table of Contents

Advertisement

Differential Carrier Assembly
Removal & Installation
4.2L Engine
To Remove:
1. Remove the front wheels from the vehicle.
2. Remove the engine protection shield from under the frame.
3. Drain the fluid from the differential carrier.
4. Remove the front propeller shaft from the differential carrier.
5. Detach the antilock brake system (ABS) harnesses from the wheel wells.
6. Detach the brake hose retainers from the frame.
7. Remove the vent hose from the differential carrier.

Upper ball pinch nut and bolt removal and installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents