Generator Removal And Installation (5.3L & 6.0L Engines) - Chevrolet Trailblazer Service Manual

Hide thumbs Also See for Trailblazer:
Table of Contents

Advertisement

5. Detach the generator from the engine.
6. Detach the battery positive cable from the generator.
To Install:
1. Attach the battery positive cable to the generator. Torque the nut to 80 in-lb (9
Nm).
2. Attach the generator to the engine. Torque the bolts to 37 ft-lb (50 Nm).
3. Attach the right engine lift hook to the engine. Torque the bolts to 37 ft-lb (50 Nm).
4. Attach the A/C line mounting bracket to the engine lift hook. Torque the bolt to 89
in-lb (10 Nm).
5. Install the drive belt onto the pulleys.
6. Connect the negative battery cable to the battery.
5.3L & 6.0L Engines
To Remove:
1. Disconnect the negative battery cable from the battery.
2. Remove the drive belt from of the pulleys.
3. Disconnect the generator connector.
4. Detach the generator cable from the generator.
Generator removal and installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents