Table of Contents

Advertisement

Figure 7
21
!
Step 1. Position the front bulkhead (20) on top of the front
kickplate (14) and main chassis (19) as shown in Figure 7. Secure
the front bulkhead (20) to the chassis (19) by threading two 4-40
x 3/8" button-head screws (21) through the hole in the top of the
bulkhead (20) and into the chassis (19).
!
Step 2. Secure the front kickplate (14) to the front bulkhead
(20) by threading a 4-40 x 3/8" flat-head screw (54) through the
center hole in the front of the kickplate (14) and into the bulk-
!
head (20).
There is a short thread-cutting screw included in the
wrench bag. This screw can be used to tap threads into the hole in
the front bulkhead. Pre-tapping this hole makes it easier to install
the screw during assembly.
Figure 8
23
!
Step 3. Insert two 4-40 x 7/8" cap-head screws (23) — one on
each side — through center holes in the top of the front shock
tower (24). Secure the screws (23) to the shock tower (24) by
threading a 4-40 nut (25) over each screw (23) and tightening.
Figure 9
9
!
Step 4. Attach the front shock tower (24) to the front bulk-
head (20) with four 4-40 x 3/8" button-head screws (21). The
screws (21) thread into the top-most and bottom-most holes in
the bulkhead (20). The center holes are not used.
IMPORTANT NOTE: The screws in the top of the
shock tower must be pointing forward as shown in Figure 9.
!
Step 5. Place one ball stud washers (9) over each of the two
3/8" ball studs (26). Thread a 3/8" ball stud (26) into the outside
hole on each side of the front bulkhead (20).

BAG B

54
25
21
26
Figure 7
23
24
3
21
19
20
14
54
24
25
Figure 8
26
21
9
20
Figure 9

Advertisement

Table of Contents
loading

Table of Contents