Danfoss ECL Comfort 210 Installation Manual page 140

Application a275 / a375
Hide thumbs Also See for ECL Comfort 210:
Table of Contents

Advertisement

Installation Guide
DHW P post-run
Circuit
2
Set the DHW pump (P3) post-run time (minutes). The DHW pump can
continue to be switched ON after the DHW heating procedure in order to
utilize the remaining heat in the heat exchanger / boiler.
0 ... 30: Set the number of minutes for the post-run.
Send desired T
Circuit
2
When the controller acts as a slave controller in a master / slave system,
information about the desired flow temperature can be sent to the master
controller via the ECL 485 bus.
OFF:
Information about the desired flow temperature is not
sent to the master controller.
ON:
Information about the desired flow temperature is sent
to the master controller.
P exercise (pump exercise)
Circuit
2
Exercises the pump to avoid blocking in periods without heat demand.
OFF:
The pump exercise is not active.
ON:
The pump is switched ON for 1 minute every third day at
noon (12:14 hours).
M exercise (valve exercise)
Circuit
2
Exercises the valve to avoid blocking in periods without heat demand.
OFF:
The valve exercise is not active.
ON:
The valve opens for 7 minutes and closes for 7 minutes
every third day at noon (12:00 hours).
140
DEN-SMT/DK
ECL Comfort 210 / 310, application A275 / A375
12041
Setting range
Factory setting
0 ... 30 m
0 m
12500
Setting range
Factory setting
OFF / ON
ON
12022
Setting range
Factory setting
OFF / ON
ON
12023
Setting range
Factory setting
OFF / ON
OFF
In the master controller, 'Demand offset' must be set to a value in order
to react on a desired flow temperature from a slave controller.
VI.GU.L1.02
Danfoss District Energy