MD2418
3. Install the inner tie rod ends. Tighten the nuts to 20
ft-lb and install new cotter pins.
MD2419
4. Route the control cables and wiring through the
metal loop on the steering post.
YT233
5. Install the body panel and gas tank cap (see Gas Tank
in Fuel/Lubrication).
MD2405
6. Install handlebar with marks aligned with the handle-
bar mounting clamps. Install the caps; then tighten
the cap screws to 10 ft-lb.
KM060A
MD2429
7. Install the control cables onto the handlebar.
MD2439
8. Make sure the cables (brake and throttle) are routed
down and away so there is no sticking or binding.
! WARNING
Make sure there is maximum right/left steering capabil-
ity and the brake and throttle cables are not affected.
19