Power Input Setup - Barco DP2K-32B Installation Manual

Hide thumbs Also See for DP2K-32B:
Table of Contents

Advertisement

3. Physical installation
3.4

Power input setup

About the power input
The projector power input can be configured for a power supply of 230/400V 3W+N+PE (Υ-connection) or for 208V 3W+PE (Δ-con-
nection). Before operating the projector, place the links in the correct position depending on the local power supply.
For a 3W+N+PE system, 400V is measured between the lines, 230V is measured between the lines and the neutral.
For a 3W+PE system, 208V is measured between the lines.
A
Image 3-9
Υ-Δ connection
A
Υ connection
B
Δ connection
Necessary tools
Flat screw driver
Wrench 10 mm
Torque wrench 10 mm
How to switch from a Υ-connection to Δ-connection
1. Loosen the 6 top nuts on the Υ/Δ configuration block. (1 to 6)
Y
Image 3-10
Υ to Δ connection
2. Take off the mounted lins (A, B and C). Two links above each other or mounted between the upper and middle pin (A, B) and one
link between the middle pin and lower pin (C).
3. Mount the links horizontally on the pins.
4. Turn a nut on each pin and secure with a torque wrench set to 7.5 Nm.
How to switch from a Δ-connection to Υ-connection
1. Loosen the top nuts on the Υ/Δ configuration block (1 to 6).
24
1
4
A
5
B
2
6
C
3
B
Δ
R59770491 DP2K-32B 30/04/2010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents