3. Physical installation
3.5
Connecting the projector with the power net
W
ARNING
ble disconnect switch, circuit breakers and ground fault current interrupters. The installation shall be done
according to the local electrical installation codes.
W
ARNING
C
AUTION
or AWG 10
Necessary tools
•
Flat torque screw driver 4 mm
•
Adjustable wrench
Necessary parts
•
Certified power cable min. 4.0 mm², 10AWG. 500V (for 3W+N+PE), cable diameter between 11mm and 21 mm or
•
Certified power cable min. 4.0 mm², 10AWG 300V (for 3W+PE) cable diameter between 11mm and 21 mm
•
Circuit breaker maximum 40A
How to connect
1. Remove the back cover.
2. Remove the power input cover.
3. Loosen the cable gland fixation ring (1).
Note: The cable gland (1) is specified for cables with a diameter between 11mm and 21mm.
Image 3-12
Power cable connection
4. Push the stripped power supply cable through the cable gland. When using a flexible power cord, make sure that each conductor
end is provided with an end sleeve.
Fix the cable in the cable gland by securing ring 1 with an adjustable wrench.
5. Connect the power cord with the terminal barrier strip. Use a flat torque screw driver set to 2 Nm.
Always connect the ground wire (PE) with the connector indicated with PE on the terminal barrier strip.
26
:
The total electrical installation should be protected by an appropriate rated and readily accessi-
:
Make sure that the voltage range of projector matches with the voltage of the local power net.
:
The cross-sectional area of the conductors in the Power Supply Cord shall be not less than 4 mm
1