Zc Shroud Assembly And Installation; Upper Hood And Lower Louver - kozy heat CSK-25 Installation And Operation Manual

Hide thumbs Also See for CSK-25:
Table of Contents

Advertisement

8.3

ZC Shroud Assembly and Installation

If installing a Full Door Shroud, follow instructions included with the component.
8.3.1
Shroud Assembly Components
(3) ZC Shroud -
top, left, & right leg
You will also need the upper hood and lower louver (included with the fireplace).
8.3.2
Assembly and Installation Instructions
1. Remove the safety barrier and glass assembly from fireplace.
2. Lay shroud sections face down on a protective surface to assemble.
3. Attach leg sections to top section by aligning holes (2 ea. side) in top section with holes in leg sections.
4. Secure with sheet metal screws (2 ea. side).
OPTIONAL: Attach shroud extensions by aligning slots in shroud with the desired whole in shroud extensions.
Secure with sheet metal screws.
5. Align mounting holes in leg sections to corresponding mounting nuts on the sides of the insert opening.
6. Secure with (4) truss head screws.
7. Reinstall glass frame assembly.
8. Install upper hood and lower louver.
9. Reinstall safety barrier.
8.4

Upper Hood and Lower Louver

8.4.1
Upper Hood Installation
1.
Align the slots in the upper hood with the corresponding slots in the mounting flange located at the top of the insert.
2.
Push back the upper hood into position. Refer to Figure 8.4, Upper Hood Installation
8.4.2
Lower Louver Installation
1.
Align the slots in the lower louver to the corresponding slots in the mounting brackets located at the bottom of the insert.
2.
Set the lower louver down into position. Refer to Figure 8.5, Lower Louver Installation.
Figure 8.4, Upper Hood Installation
Upper hood
(2) shroud extensions
NOTE
(8) sheet metal screws
Figure 8.5, Lower Louver Installation
18
(4) truss head screws
Lower louver

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chaska-25

Table of Contents