Shroud Installation; Safety Barrier Installation - kozy heat ROOSEVELT 29 BAK Installation And Operation Manual

Direct vent gas fireplace insert
Table of Contents

Advertisement

8.2 Shroud Installation

CAUTION: Trim panels or surrounds must not seal ventilation
openings in existing fireplace that this appliance is installed in.
Draft relief openings must not be covered or blocked.
WARNING: The flow of combustion and ventilation air must not be
obstructed.
1.
Remove glass frame assembly.
2.
Align leg section holes on the shroud to the corresponding
mounting nuts in mounting brackets on each side of the insert
metal cabinet.
3.
Secure with (4) phillips truss head screws (provided).
4.
Reinstall glass frame assembly.
Figure 8.4, Aligned Mounting Nuts and Brackets
#RVT-29-BAK R.3 November 2019

8.3 Safety Barrier Installation

1.
Locate the (4) slots on the glass frame (2 each side).
2.
Align the tabs located on the back of the safety barrier with the
slots on the glass frame.
3.
Raise the safety barrier slightly into the slots and allow the tabs
to lower into position.
To remove safety screen: lift the screen up and out of slots.
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
25
FACING AND FINISHING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rvt-29-bak

Table of Contents