WARNING
Do not attempt to start the boiler before
lling and purging the boiler system. A
dry re may cause injury, may seriously
damage the boiler, may result in property
damage, and will void the warranty.
2-26
FIGURE 20 WALL THIMBLE INSTALLATION
7 feet above nished grade, (National Fuel Gas Code, ANSI Z223.1).
3. The vent termination must be at least 4 feet (1.22m) horizontally from,
and in no case above or below, unless a 4-foot (1.22m) horizontal distance
is maintained from electric meters, gas meters, regulators, and relief
equipment.
4. The air supply inlet and exhaust outlet must be separated from 4 ft.
minimum to 10 ft. maximum on the same wall. The exhaust outlet must
be installed 4 ft. minimum above and downwind from air supply inlet to
prevent exhaust recirculation.
5. Under certain wind conditions, some building materials may be a ected by
ue products expelled in close proximity to unprotected surfaces. Sealing or
shielding of the exposed surfaces with a corrosion resistant material (such
as aluminum sheet) may be required to prevent staining or deterioration.
Do not locate the vent termination too close to shrubbery as ue products
may stunt their growth or kill them.

After Installation/Prior to Start-Up

Completely ll and purge the heating system using the following sample
procedure:
NOTE: The following purge procedure is applicable to the piping
con guration as shown in Figure 21.
1. Close combination shuto /purge valve in supply, all drain cocks, the
SECTION 2
PHW-IOM-2013-0214
© The Fulton Companies 2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phw 1000Phw 1400Phw 500Phw 2000Phw 750

Table of Contents