Before Leaving The Installation - FULTON PHW 300 Installation And Operation Manual

Gas pulse combustion hydronic heating boiler
Table of Contents

Advertisement

INSTALLATION
reliability problems. Regulators, other than speci ed,
may be acceptable, but it has been our experience that
Fisher regulators operate the most satisfactorily.
4. Recommendations for installing step down regulators:
There must be a minimum of 10 pipe diameters of
straight pipe before the inlet and after the outlet of
the regulator.
Vent pipe must not be reduced to a smaller size than
the opening size of the regulator vent. Use the next
size pipe for every ten inches of pipe.
Install a union close to the outlet of the regulator for
ease of removal and maintenance.
Vent to a safe area.
2-30
PHW-IOM-2013-0214

Before Leaving the Installation

1. Check all controls to insure they are operating properly.
Cycle boiler several times by raising and lowering
operating temperature on the temperature controller.
2. Make sure installation complies with all applicable
codes.
SECTION 2
© The Fulton Companies 2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phw 1000Phw 1400Phw 500Phw 2000Phw 750

Table of Contents