Horizontal Vent Termination - FULTON PHW 300 Installation And Operation Manual

Gas pulse combustion hydronic heating boiler
Table of Contents

Advertisement

SECTION 2
PHW-IOM-2013-0214
intake and vent pipes are passed, then tighten securely.
They will prevent the intake and vent pipes from being
pushed or pulled.

Horizontal Vent Termination

Adhere to the following for horizontal vent terminations:
1. Join the vent termination to the vent pipe outside the
Questions? Call (315) 298-5121, or visit us online at www.fulton.com
FIGURE 19 HORIZONTAL INSTALLATION WALL PENETRATIONS
wall. Use the same joining procedures for vent pipe and
ttings.
2. Ensure the termination of the vent system is at least 12"
above the nished grade, or at least 12" above normal
snow accumulation level (for applicable geographical
areas). Refer to Figure 19. The termination of the vent
system shall not be located in tra c areas such as
walkways, adjacent buildings, openable windows and
building openings unless the venting system is at least
INSTALLATION
2-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Phw 1000Phw 1400Phw 500Phw 2000Phw 750

Table of Contents