Packaging The Unit For Transportation - Qualstar Q48 Installation And Operation Manual

Tape library
Table of Contents

Advertisement

Q24/Q48 Tape Library

6 Packaging the unit for transportation

WARNING
NOTE
Before packaging the library:
1. Pull out the tab with the product ID label (1)
2. Note the part and serial number (2)
3. Package the appropriate library as shown in Figure 70 or Figure 71.
4. If returning the unit to Qualstar for repair, please call the Technical Support department to
request an RMA number (See: Contacting Qualstar)
© Copyright QUALSTAR 2015
Weight of Q24/Q48 Tape Library - Risk of personal
injury
Before lifting a library:
 Observe local health and safety requirements and guidelines for
manual material handling.
 Obtain adequate assistance to lift and stabilize the library during
packaging.
Before transporting the library, the shipping lock and the yellow
label must be replaced into the slot on the top cover of the
library from its storage slot on the rear panel.
Figure 70 Product ID label
Installation and Operations Manual
Part No: xxx xxx xxx-xx
xxxxxxxxxxx
Serial No: xxxxxxxxxx
xxxxxxxx
WWYY: xxxx
xxxx
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q24

Table of Contents