Power Up - OneAccess ONE100 Installation Manual

Hide thumbs Also See for ONE100:
Table of Contents

Advertisement

Power up

7
To power up the device, always follow these steps:
Connect the DC power input jack from the power supply to the DC power
input of the rear panel of the router,
Connect the power supply to the AC mains (200-240 V AC).
Few seconds after power-on, the device performs a series of self-tests and loads
the software into memory (RAM), during which the 'STATUS' LED on the front panel
blinks.
At the end of software loading (about 30 seconds):
The 'STATUS' LED light remains steady green if software initialization was
successful,
The 'STATUS' LED blinks in case of software absence or error during
software loading.
Refer to the Software and ONEOS User Guide for more information.
40
ONE100 - Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ONE100 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF