Yamaha 2007 FZ6-NA Service Manual page 121

Table of Contents

Advertisement

FZ6-N/FZ6-NHG(W)
1. Right handlebar switch lead
2. Throttle cables
3. Battery positive lead
4. Battery cover
5. Connector cover
6. Fuel tank breather hose
7. Lean angle sensor
8. Fuse box
9. Rear right turn signal light lead
10.License plate light lead
11.Rear left turn signal light lead
12.Seat lock cable
13.Rectifier/regulator
14.ECU (engine control unit)
15.Fuel tank drain hose
16.Cover
17.Starter relay lead
18.Battery negative lead
19.Battery negative lead coupler
20.Left handlebar switch lead
21.Clutch cable
22.Cover 2
23.Air cut-off valve hose
24.Spark plug lead
A. Either front or rear side arrangement for
the left handlebar switch lead coupler and
radiator fan motor coupler can be
accepted.
B. Point the L-shape terminal to the front side
of the vehicle.
C. To the crankshaft position sensor.
D. Route the crankshaft position sensor lead
above the starter motor leads.
E. Clamp the starter motor lead and crank-
shaft position sensor lead. Point the pro-
jected part of the tip to the inner side of the
vehicle.
F. Pass the radiator hose, wire harness and
starter motor lead in order through the
lower side of the vehicle.
G. Set the 4 couplers in the connector cover
after wiring it.
H. To the sidestand switch
I. To the speed sensor
J. To the AC magneto
K. To the oil level switch
L. The flap hole is located at the right side of
the vehicle.
M. To the neutral switch. Place the neutral
switch lead coupler under other leads so
that it is not seen through the frame open-
ings.
N. To the tail/brake light switch
O. To the O
sensor
2
P. Clamp the neutral switch lead, tail/brake
light lead and O
clamp opening to the rear side.
Q. Push the wire harness in the groove of the
mud guard.
R. Point the opening section of the clamp
upward.
S. To the tail/brake light
T. To the license plate light
U. To the rear left turn signal light
V. To the rear right turn signal light
W. Point the tip of the clamp to the outside of
the vehicle.
X. Insert the enwinding clamp of the wire har-
ness into the hole of the rear frame.
Y. Attach the rectifier/regulator lead with the
clamp of the regulator bracket.
Z. To the engine ground.
AA.To the fuel injection
AB.To the fuel pump
AC.Route the clutch cable under the fuel injec-
tion lead.
AD.Pass the clutch cables through the clamp,
and then install the clamp to the cover.
Position of the clamp is forward of the
cable stopper.
AE.To the main switch
AF.To the immobilizer
AG.Place the adjuster of the clutch cable
above the cover.
AH.Route the starter relay lead outside of the
main switch and immobilizer lead and pass
forward the fuse holder.
AI. Clamp the horn lead. Point the opening
section of the clamp outside.
AJ.Route the left handlebar switch lead under
of the clutch cable.
AK.Install the connector cover pointing its
large diameter opening to the left side of
the vehicle body.
AL.After connecting the coupler of the connec-
tor cover, position it inside.
AM.To the meter
AN.To the main switch and immobilizer
AO.Throttle cables can be routed under the
battery box.
AP.Route the throttle cables behind the #1 and
#4 spark plug lead.
AQ.Pass the spark plug leads #1 and #4
through the slit of the cover 2.
AR.Route the throttle cables by the front side
of the #2 and #3 spark plug lead.
AS.Route the throttle cables under the vent
hose of the air-cut valve.
AT. Pass the spark plug lead #3 through the
outer hole of the cover 2.
AU.Pass the spark plug lead #2 through the
inner hole of the cover 2.
2-76
CABLE ROUTING
sensor lead. Point the
2

Advertisement

Table of Contents
loading

Table of Contents