Yamaha 2007 FZ6-NA Service Manual page 113

Table of Contents

Advertisement

FZ6-NA/FZ6-NAHG
1. Main switch and immobilizer lead
2. Meter and left handlebar switch lead
3. Clutch cable
4. Battery negative lead coupler
5. Starter motor relay lead
6. Battery negative lead
7. Fuel tank drain hose
8. Hydraulic unit lead
9. Rectifier/regulator
10.Turn signal relay
11.Radiator fan motor relay
12.Starting circuit cut-off relay
13.Clamp
14.License plate light lead
15.Rear right turn signal light lead
16.Rear left turn signal light lead
17.Dimmer relay
18.Speed sensor lead
19.Sidestand switch lead
20.Oil level switch lead
21.AC magneto lead
22.Front brake hose
23.Throttle cable (return side)
24.Throttle cable (pull side)
25.Radiator fan motor lead
26.Air cut-off valve lead
27.ABS check coupler
28.Connector
29.Left handlebar switch lead
A. Route the main switch and immobilizer
lead inside (in the width direction of the
vehicle) of the left handlebar switch lead.
B. To the auxiliary light
C. To the meter
D. Line up the left handlebar switch lead cou-
pler and radiator fan motor lead coupler
behind the head
E. Route the clutch cable over the wire har-
ness.
F. To the immobilizer
G. To the main switch
H. Place three couplers on the flange of the
cover.
I. To the front wheel sensor. Place the
between frame and clutch cable on the
clutch cable fixing bracket.
J. To the fuel pump
K. Clamp four wire leads. There should be no
excessive slack on the wire leads.
L. To the fuel tank
M. Either installation position can be
accepted, but make sure that the leads are
not crossed.
N. Clamp the rear turn signal lead and license
plate light lead to the frame. Hook the
clamp to the bracket. Pull out the lead suffi-
ciently to the frame side and route it along
with the side of the back stay. Cut the tip of
the clamp to be between 1 and 5 mm (0.04
and 0.20 in) upward.
O. Clamp the rear turn signal light lead and
license plate light lead to the frame. Cut the
tip of the clamp to be between 1 and 5 mm
(0.04 and 0.20 in).
P. Gap between the lead and muffler should
be 10 mm (0.39 in) or more.
Q. Coupler should not run on the relay assem-
bly.
R. To the tail/brake light
S. To the license plate light
T. To the rear turn signal light (right)
U. To the rear turn signal light (left)
V. To the engine
W. Route the speed sensor lead behind the
starter motor lead
X. Point the bend-R section of the throttle
cable (pull side) to the inner side horizon-
tally. It is also possible to visually check the
bend-R section. the illustration. Secure the
clamp to the weld of the cross member
with the frame. Position the binding section
in front of the vehicle body and cut the tip
to be between 1 and 5 mm (0.04 and 0.20
in).
Y. Connect the ABS check coupler to the con-
nector, and then install the ABS check cou-
pler to the bracket.
Z. To the headlight bulb
AA.Clamp the seat lock cable to the frame as
shown in the illustration. Secure the clamp
to the weld of the cross member with the
frame. Position the binding section in front
of the vehicle body and cut the tip to be
between 1 and 5 mm (0.04 and 0.20 in).
AB.Point the tip of the clamp to the inner side
of the vehicle body.
AC.To the headlight bulb
AD.To the auxiliary light socket
AE.To the wire harness
AF.Route the main switch and immobilizer
lead inside (in the width direction of the
vehicle of the left handlebar switch lead.)
2-68
CABLE ROUTING

Advertisement

Table of Contents
loading

Table of Contents