EPSON AcuLaser C2600/2600
A4. Connect the connectors of the HARNESS, HV, 1ST TRANSFER to the electrode
of the TRANSFER UNIT, Assy., ASP.
A5. While pressing the LEVER, PATCH, insert the WIRE, PATCH to the 2 tabs of the
LEVER, PATCH.
A6. Put the HARNESS, AC, FU underneath the HARNESS, MAIN, and hook the
HARNESS, MAIN and the HARNESS PANEL on the tab of the HOLDER,
COVER, TOP, FRONT.
A7. Match the 2 dowels of the HOLDER, COVER, TOP, FRONT with the positioning
holes, and secure them with 2 screws.
C.C.S-TITE SCREW,3x8,F/Zn: 2
A4. The tab of the SHEET, HARNESS, FU occasionally come off from
C A U T I O N
the notch after removing the HOLDER COVER, TOP, FRONT.
Be sure to confirm that the tab is securely inserted.
A8. Connect the connector of the HARNESS, AC, FU to the Power Supply.
A9. Connect the 2 connectors to the Fuser cover open sensor.
Disassembly and Assembly
Figure 4-80. Reinstallation of TRANSFER UNIT, Assy., ASP 2
Disassembling/Assembling the Main Unit
Fuser Cover
Open Sensor
A4
A9
A9
A8
A6-2
A6-1
A7-1
A7-2
WIRE, PATCH
A5
Revision B
HOLDER, COVER,
TOP, FRONT
A7-1
A7-2
Caution
A4
SHEET,
HARNESS, FU
04006301
289