Suzuki DL650K5 Service Manual page 268

Table of Contents

Advertisement

6-18
COOLING AND LUBRICATION SYSTEM
• Install the new mechanical seal with the special tool.
& 09913-70210: Bearing installer set () 25 mm)
• Install the new bearings with the special tool.
& 09913-70210: Bearing installer set () 25 mm)
NOTE:
The stamped mark on the bearing faces to the crankcase side.
• Install the rubber seal 1 into the impeller.
• After wiping off the oily or greasy matter from the mechanical
seal ring, install it into the impeller.
NOTE:
The paint marked side A of the mechanical seal ring faces to
the impeller.
• Apply SUZUKI SUPER GREASE to the impeller shaft.
* 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
• Install the impeller to the water pump body.
• Fix the impeller shaft with the E-ring 2.
• Apply SUZUKI SUPER GREASE to the O-rings.
* 99000-25030: SUZUKI SUPER GREASE "A" (USA)
99000-25010: SUZUKI SUPER GREASE "A" (Others)
• Install new O-rings 3.
• Fill the bearing with engine oil until engine oil comes out from
the hole of the be bearing housing.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents