section 71
Closing cover of the BC10
Close the cover of the BC10 on the front of the boiler [1].
section 72
Switching off power supply
ON
OFF
Switch off the power supply to the heating system.
section 73
Opening boiler door
Open the door lock by turning it a quarter turn counterclock-
wise using a bleed key [1].
Push the lock down [2] and open the door [3].
If a pump group is available: Remove the casing of the pump
group [4].
Logamax plus GB162-80 kW/100 kW - Subject to modifications resulting from technical improvements!
section 74
Closing isolating valves
If a pump group is available: Close the heating supply and
return isolating valves [1] by turning them in a clockwise
direction (closed position: at a right angle to the pipework).
If a pump group is available: Close the gas stop valve [2] by
turning it in a clockwise direction (closed position: at a right
angle to the pipework).
section 75
Draining the system
Switch off the power supply to the heating system, see
section 72.
If a pump group is available: Remove the casing of the pump
group as indicated in section 73.
Close the service valves if a pump group is available,
see section 74, [1].
Loosen the cap on the automatic air purging system located
on the top left-hand part of the boiler by turning it through one
rotation.
Remove the cap of the filling and drain valve of the boiler.
Connect the filling hose to the filling and drain valve of the
boiler.
Actions
7
57