Water Hose Routing Diagram - Suzuki GSF1250 Service Manual

Hide thumbs Also See for GSF1250:
Table of Contents

Advertisement

Water Hose Routing Diagram

"T"
"Q"
"C"
"R"
3
6
4
5
6
"C"
"H"
"E"
"G"
1. Jiggle valve
2. Thermostat
3. Reservoir tank
4. Radiator heat shield
5. Radiator cover molding (GSF1250/A only)
6. Tape (GSF1250/A only)
7: Radiator outlet hose
: Check that there is at least 20 mm (0.8 in) of clearance between the
radiator outlet hose and the exhaust pipe.
"A": Match mark
"B": Marking position
"C": White marking
"D": Yellow marking
"E": Red marking
"F": The end of the clamp should face upward.
"G": The end of the clamp should face forward.
"H": The end of the clamp should face right side.
"I": The end of the clamp should face left side.
"S"
"U"
"W"
"V"
"D"
"F"
"a"
"P"
7
"G"
"C"
"E"
1
2
"L"
"C"
"I"
"D"
90
90
"F"
"A"
"L"
90
"B"
"J": The clamp screw head should face right backward.
"K": The clamp screw head should face left backward.
"L": The clamp screw head should face upward.
"M": The clamp screw head should face left upward.
"N": The clamp screw head should face right side.
"O": The clamp screw head should face left side.
"P": The clamp screw head should face forward.
"Q": Clamp the hose on yellow marking with the tail lamp harness.
"R": Clamp the hose on white marking.
"S": Pass through the hose under the wiring harness.
"T": Pass through the hose under the seat lock plate.
"U": Be careful not to pinch the hose between seat cushion and fender.
"V": Pass through the hose between frame and reservoir tank. Be careful for
the hose not to be slackened.
"W": Pass through the hose under the helmet holder.
"X": Clamp the hose with the fan motor lead wire. Be careful not to insert the
coupler to the radiator heat shield hole.
"a": Clearance
Engine Cooling System:
"N"
"M"
"X"
"D"
"C"
"F"
"O"
"D"
/
"E"
7
"C"
"C"
"O"
"D"
1F-3
B718H11602005
"J"
"C"
"K"
"D"
I718H1160074-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gsf1250aGsf1250sGsf1250sa

Table of Contents