Chery QQ Service Manual page 334

Sqr 472 engine
Table of Contents

Advertisement

Chery QQ Service Manual
Charging System
4. Loosen the belt pulley nut with clamp and
remove the belt pulley.
Note:
When the clamp is used, a piece of clean cotton
cloth should be laid between rotor and clamp to
avoid the damage to rotor.
Always clamp the part "A" instead of part "B", for
the structural strength of part B doesn't suit firm
clamping.
1a
Belt pulley nut
2
Clamp
3
Belt pulley bolt
4
Cotton cloth
5
Rotor
5. Remove the nut of B terminal post and isolator.
6. Remove 3 bolts and take off the rear cover.
7. Remove 3 bolts and pull out the brush carrier assembly.
8. Remove 3 bolts and pull out the regulator of integrated
circuit.
9. Remove 3 bolts and stretch the stator coil lead, and then take out the rectifier.
10. Remove the bolts and nuts in the rear frame, and then push out the rear frame with
rotor.
11. Remove the end housing bearing with
bearing puller.
Note: When the bearing puller is used, it
is subject to careful operation to avoid
deforming the cooling fan blade.
- 27 -

Advertisement

Table of Contents
loading

Table of Contents