Cooling System Hose Routing - Suzuki GW250 Service Manual

Table of Contents

Advertisement

10-20 SERVICING INFORMATION

COOLING SYSTEM HOSE ROUTING

Reservoir tank
overflow hose
Clamp
Pass the drain hose
between the air cleaner,
upper crankcase
and frame bridge.
Frame
bridge
Fuel tank water
drain hose
Thermostat
The clamp screw
head should face
right side.
The clamp screw
head should face
forward.
Frame
6 N·m
(0.6 kgf-m, 4.5 lbf-ft)
Wiring
harness
MAX.
First, tighten the reservoir tank mounting bolt (upper),
and then, tighten the reservoir tank mounting bolt (lower).
18 N·m
(1.8 kgf-m, 13.0 lbf-ft)
White mark
The clamp
The clamp screw head
screw head
should face right side.
should face
forward.
The clamp end
should face
downward.
Yellow mark
The clamp end
should face upward.
6 N·m
(0.6 kgf-m, 4.5 lbf-ft)
1.5 mm
(0.06 in)
The clamp end
should face
downward.
The clamp
end should
face upward.
White mark
10 N·m
(1.0 kgf-m, 7.0 lbf-ft)
Do not contact
the clamp screw
and bracket.
2 – 8 mm
(0.08 – 0.31 in)
Clearance
Marking
Stopper
Connect the reservoir tank
overflow hose and reservoir
tank inlet hose as shown.
UP
40 – 50
Reservoir tank
The clamp screw
head should face
right side.
Yellow mark
Reservoir tank
overflow hose
0 – 10
7 N . m
0.7 kgf-m
(
)
5.0 lbf-ft

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250l3

Table of Contents