4. Push the module into the socket until the socket latches snap into place
and secure the PPM.
5. Replace the server access panel.
6. Push the server into the rack, secure with thumbscrews, and reconnect
cables.
7. Power on the server and use the System Configuration Utility to
reconfigure your system.
Installing Hardware Options 3-7